Target Paper Status Summary 13th December 2011 Chris Booth
1 Introduction (KL) ok • 2 Requirements and Overview (CB) ok • 3 Linear motor (CB) • 3.1 Electromagnetic design (PS/NS) missing • 3.2 Stator (CB,PS) needs figs & refs • 3.3 Permanent magnets (CB,PS) needs figs & refs • 4 Mechanical design and construction (JT) • 4.1 Target Shaft (JT) needs figs & refs • 4.2 Target Bearings (JT) needs figs & refs • 4.3 Stator (JT) see 3.2 • 4.4 Mechanical integration (CB – are people happy?) check numbers • 4.5 Quality Assurance & Quality Control (JT, GB, PS?) magnetic missing • 5 Optical position-measurement system (CB,PS) • 5.1 Optical Vane (PS,CB) needs figs & refs • 5.2 Laser Source (PS,CB) needs figs & refs • 5.3 Optical Fibres (PS,CB) needs figs & refs • 5.4 Collimators, Lenses & Mechanical Mount (PS,CB) needs figs & refs • 5.5 Optical sensors (PS,CB) brief! • 6 Stator Operation & Power electronics (PS) lengthy! needs figs • 7 Control, Electronics & DAQ (PS) needs figs • 8 Performance (PH,AD) missing • 9 Summary (CB) missing
Summary • Most of the material is now there! • CB edited some sections to improve consistency, remove history, .... More editing needed! • Most lack figures and references. • (Some figs from JT – quality may be an issue.) • Some sections missing: • EM Design: N Schofield contacted, agreed to provide. • Magnetic QA – PS listed, should be BS! • Performance: PH & AD • In absence of EMcC I wrote “mechanical integration” section (frame, jacking system, services) • Are they adequate? • Is the balance ok? • Previously decided to document design of last summer. Do we wish to update? • Said would review when present version complete.
Next? • We need the missing sections! • Still inconsistencies of style (level of detail, tenses, etc.) • Propose I revise text, send list of figures (& references) required. • Need input! • Others’ views on amount of detail. • Are bullet-points acceptable? • Can we reference internal notes? • Add summary, aim for essentially complete draft early(-ish!) in New Year. • Are we agreed we leave new stator for later paper?