Target Paper Status Summary 21st December 2010 Chris Booth
1 Introduction (KL) ok • 2 Requirements and Overview (CB) ok • 3 Linear motor (CB) • 3.1 Electromagnetic design (PS) missing • 3.2 Stator (CB,PS) needs figs & refs • 3.3 Permanent magnets (CB,PS) needs figs & refs • 4 Mechanical design and construction (JT) • 4.1 Target Shaft (JT) needs editing, figs etc • 4.2 Target Bearings (JT) needs editing, figs etc • 4.3 Stator (JT) needs editing, figs etc • 4.4 Mechanical integration (who?? Was EMcC) missing • 4.5 Quality Assurance and Quality Control (JT, GB, PS) partly • 5 Optical position-measurement system (CB,PS) nearly! • 5.1 Optical Vane (PS,CB) needs figs & refs • 5.2 Laser Source (PS,CB) needs figs & refs • 5.3 Optical Fibres (PS,CB) needs figs & refs • 5.4 Collimators, Lenses & Mechanical Mount (PS,CB) partly • 5.5 Optical sensors (PS,CB) partly • 6 Control system (PS,JL) missing • 7 Power electronics (PS,SG) missing • 8 Performance (PH,AD) missing • 9 Summary (CB) missing
Summary • Not a lot of progress since early November! • Hope to restart editing in New Year. • Lots of material provided by JT. CB to edit to make consistent with rest. • Intro provided by KL. • Other sections written by CB (partly plagiarising PS thesis!). • Most lack (sufficient quality) figures. • Many sections not yet provided! • Who will write “mechanical integration” section (frame, jacking system, services)? • I can write functional description. • Is that sufficient? • Previously decided (I think!) to document design of last summer. Do we wish to update? • Review when present version complete?