1 / 11

Konstantina Papachristopoulou Athens Technology Center S.A.

WP2 “Design and implementation of infrastructure capturing energy carbon data” State of advancement. Konstantina Papachristopoulou Athens Technology Center S.A. WP2 Current Status. WP is active for 6 months (End is due for October 2013) Active tasks during this period:

margie
Download Presentation

Konstantina Papachristopoulou Athens Technology Center S.A.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP2 “Design and implementation of infrastructure capturing energy carbon data”State of advancement Konstantina Papachristopoulou Athens Technology Center S.A.

  2. WP2 Current Status • WP is active for 6 months (End is due for October 2013) • Active tasks during this period: • T2.1 Infrastructure capturing & storing energy data (AUEB) • T2.2 Energy consumption of SC processes & PLM data management (DITF) • T2.3 Energy Consumption Reduction Tool (ENEA) • T2.4 Energy Monitoring Tools Design (ATC)

  3. Overview of activities (1/2)

  4. Overview of activities (2/2)

  5. ToC D2.1 (1/2) • Introduction (Motivation, Approach) • High level Architecture (Prerequisites, Data Capturing & Storing Infrastructure) • Data Capturing Infrastructure (Proposed data format, Embodying existing Energy Management Systems, Using Open Solutions) • Data Storing Infrastructure (XML Parsing & Cleansing, HBase, Hadoop – Aggregation, RDMS)

  6. ToC D2.1 (2/2) • Security Issues (Confidentiality, Integrity, Availability) • Energy consumption of SC processes & PLM data management • Mapping of direct and indirect energy consumption to products & processes • Accumulation of energy consumption/carbon emissions across the supply chain

  7. Pending Tasks • Finalisation of Identification of the project case studies (WP1) • Finalisation of the first phase of T2.1 (Setting of the overall infrastructure) and T2.2 (Methods & data management structure) and submission of D2.1 • Submission of the initial version of the energy consumption reduction tool (T2.3)

  8. Critical pending issues • Acquisition and Installation of metering devices at Piacenza • Decision on the way the energy data of MC will be transmitted to the Technology partners • Drafting and submitting D2.1 (AUEB /DITF, with contributions from ENEA) – Due on May 31st 2012

  9. Six months planning (1/3)

  10. Six months planning (2/3)

  11. Six months planning (3/3)

More Related