WP2 “Design and implementation of infrastructure capturing energy carbon data” State of advancement. Konstantina Papachristopoulou Athens Technology Center S.A. WP2 Current Status. WP is active for 6 months (End is due for October 2013) Active tasks during this period:
E N D
WP2 “Design and implementation of infrastructure capturing energy carbon data”State of advancement Konstantina Papachristopoulou Athens Technology Center S.A.
WP2 Current Status • WP is active for 6 months (End is due for October 2013) • Active tasks during this period: • T2.1 Infrastructure capturing & storing energy data (AUEB) • T2.2 Energy consumption of SC processes & PLM data management (DITF) • T2.3 Energy Consumption Reduction Tool (ENEA) • T2.4 Energy Monitoring Tools Design (ATC)
ToC D2.1 (1/2) • Introduction (Motivation, Approach) • High level Architecture (Prerequisites, Data Capturing & Storing Infrastructure) • Data Capturing Infrastructure (Proposed data format, Embodying existing Energy Management Systems, Using Open Solutions) • Data Storing Infrastructure (XML Parsing & Cleansing, HBase, Hadoop – Aggregation, RDMS)
ToC D2.1 (2/2) • Security Issues (Confidentiality, Integrity, Availability) • Energy consumption of SC processes & PLM data management • Mapping of direct and indirect energy consumption to products & processes • Accumulation of energy consumption/carbon emissions across the supply chain
Pending Tasks • Finalisation of Identification of the project case studies (WP1) • Finalisation of the first phase of T2.1 (Setting of the overall infrastructure) and T2.2 (Methods & data management structure) and submission of D2.1 • Submission of the initial version of the energy consumption reduction tool (T2.3)
Critical pending issues • Acquisition and Installation of metering devices at Piacenza • Decision on the way the energy data of MC will be transmitted to the Technology partners • Drafting and submitting D2.1 (AUEB /DITF, with contributions from ENEA) – Due on May 31st 2012