PROJECTS

PROJECTS. 1 st and 2 nd row right + left (Ford Galaxy). Execution Period: 6 weeks Price (4): 188.678 € Hot runner system: Moldmaster Steel: 1.2711 1 cavity each mould. 1- Joint 2 - Duct. Execution Period: 4 weeks Price: 32.500 € Cold runner Steel: 1.2711 2 cavities.

marisar
Download Presentation

PROJECTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECTS

  2. 1st and 2nd row right + left (Ford Galaxy) Execution Period: 6 weeks Price (4): 188.678 € Hot runner system: Moldmaster Steel: 1.2711 1 cavity each mould

  3. 1- Joint 2 - Duct Execution Period: 4 weeks Price: 32.500 € Cold runner Steel: 1.2711 2 cavities Execution Period: 4 weeks Price: 18.000 € Cold Runner Steel: 1.2711 2 cavities 2 1

  4. Ecran sous Reservoir (sandwich mould) Execution Period: 10 weeks Price: 170.500 € Hot runner system: Moldmaster Steel: 1.2311 1 + 1 cavities

  5. Colector (sandwich mould) Execution Period: 13 weeks Price: 156.000 € Hot runner system: Incoe Steel: 1.2344 hardened 2 + 2 cavities

  6. Carcasa Volvo Execution Period: 6 weeks Price: 98.000 € Hot runner system: Dan Tip Steel: 1.2311 1 + 1 cavities

  7. Lens Holder Execution Period: 6 weeks Price: 22.000 € Hot runner system: Hasco Steel: 1.2344 hardened 2 cavities

  8. Tirador Puerta Execution Period: 7 weeks Price: 29.000 € Cold Runner Steel: 1.2311 1 + 1 cavities

  9. Cañon Retinidor de Sonido Execution Period: 5 weeks Price: 29.000 € Cold Runner Steel: 1.2711 2 cavities

  10. Bas de Caisse Execution Period: 12 weeks Price: 213.000 € Hot runner system: Incoe sequential Steel: 1.2738 HH 1 + 1 cavities

  11. Bracket a Digital Execution Period: 5 weeks Price: 86.000 € Cold runner Steel: 1.2311 2 cavities

  12. Bracket G2 Execution Period: 5 weeks Price: 88.000 € Hot Runner System: EMP Steel: 1.2311 2 cavities

  13. Base Filtros Soplados Execution Period: 4 weeks Price: 29.000 € Cold Runner Steel: 1.2311 1 cavity

  14. Helmet Execution Period: 8 weeks Price: 45.000 € Hot nozle Steel: 1.2311 1 cavity

  15. Multibutton Execution Period: 4 weeks Price: 21.500 € Injection System of 3 Plates Steel: 1.2311 4 cavities

  16. Stand Foot Execution Period: 6 weeks Price: 18.750 € Hot Runner System: EMP Steel: 1.2311 2 cavities

  17. 1. Mascara 2. Cristal Execution Period: 6 weeks Price: 37.000 € Hot Runner System: Moldmaster Steel: 1.2711 Execution Period: 6 weeks Price: 27.100 € Cold Runner Steel: 1.2711 2 1

  18. Support (Sandwich mould) Execution Period: 13 weeks Price: 155.000 € Hot Runner System: Incoe Steel: 1.2344 hardened 2 + 2 cavities

  19. Maleta K72 Execution Period: 6 weeks Price: 44.800 € Hot Runner System: EMP Steel: 1.2311

  20. Culata Execution Period: 12 weeks Price: 60.000 € Hot Runner System: Incoe Steel: 1.2711

  21. Windweiser LH/RH Execution Period: 4 weeks Price: 30.000 € Cold Runner Steel: 1.2711 1 + 1 cavities