1 / 20

Presentation Instructions

Presentation Instructions. When using this presentation template, here are a few things to consider:.

marnie
Download Presentation

Presentation Instructions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation Instructions When using this presentation template, here are a few things to consider: • These are examples, and you should input your specific project information where applicable. With PowerPoint, you can copy these slides into your PPT format and they will take on the overall design and color scheme that you would use for any other presentation. • These pages are set up to show all the phases, but depending on the timing of your presentation, you will use only those pages that apply based on where you are in the DMAIC cycle • You may wish to add other pages, such as more graphs or maps; however, keep the overall number of pages to a minimum, and don’t forget, you can always add more detail in the appendix to use as back-up, if you need them. • There are a couple of different ways to show next steps depending on your preferences and data; use at least one method at each presentation. • You should have a project plan that you can update and present at each formal presentation. • The best presentations have these components; • Introduce the team, giving credit to everyone involved • Current status • Key findings/concerns (bullet points and/or graphs) • Next steps

  2. Project Title Team Lead name Team Members Member names Member names Process Owner name Champion name Insert your company logo here

  3. Project Charter Problem Statement Insert problem statement here Goal Insert goal statement here Identify boundaries; what is to be considered In Scope Identify boundaries; what is not to be considered Out of Scope

  4. Name of Process S I P O C Suppliers Inputs Outputs Customer Insert suppliers here Insert inputs here Insert outputs here Insert customers (segments or names) here High Level Process Start End

  5. Define Voice of the Customer Insert graph or other info about customer data collection • Insert detailed • Measurable • Requirements

  6. Schedule Milestones Example: Very high level milestone chart with main phases of DMAIC Project Start Date: 06/19/01 Define: 06/20/01 – 8/01/01 Measure: 08/02/01 – 10/05/01 Analyze: 10/01/01 – 10/17/01 Improve: 10/18/01 - 11/26/01 Control: 11/26/01 - 12/26/01 Closure/Handoff to Process Owner: 01-01-02

  7. Measure - Data Collection Suggestions: insert info on your data collection plan, sampling strategy, compilation form, key operational definitions, etc. Another good use of slides in your Measurement section is to demonstrate your baselines. You can use Proportion Defective calculations, Yield, Dpu, COPQ, etc. (see notes below)

  8. Measure – Key Performance Indicators This should be a MUST have slide to record your KPI. What would be the most critical metrics in terms of outcomes and predictors. KPI – Outcomes Outputs KPI – Inputs & Process Metrics

  9. Measure - COPQ $ Baseline the financial opportunity for your project Show with bullets or graphs

  10. Analyze - Data Analysis Insert graphs here to demonstrate performance and key findings

  11. Analyze - Process Analysis

  12. Analyze - Root Cause

  13. Improve - Pilot Findings

  14. Improve - Implementation Plan

  15. Improve - Cost Benefit Analysis Insert info related to the cost benefit analysis; work with your financial advisor to complete this activity

  16. Control This is a great place to include your Control Plan - insert charts for monitoring key indices for the process (dashboards)

  17. Control - Process Management

  18. Key Findings Key Findings Key Concerns • Main point • sub bullet for details • Main point • sub bullet for details

  19. Next Steps • List out bullet points • Include transition from one phase to another • You could use a copy of your project management plan if you would like

  20. Q & A

More Related