1. 1 C4ISR Acquisition Engineering & Integration (CAEI) Contract Strategy Lead C4I Platform System Engineering
for the Future Naval Force Structure:
Integrated C4I Platform Architecture
Platform integration
E2E Distributed Testing
FY 06 Army Sponsor
Reimb. New orders 26,442,000
Direct Cite new orders 94,610,000
Grand total 136,975,000FY 06 Army Sponsor
Reimb. New orders 26,442,000
Direct Cite new orders 94,610,000
Grand total 136,975,000
2. 2 SCN
3. 3 CAEI* Production Products & Services Equipment Rack Integration
Cable and Harness Fabrication
Pre-production and Kitting
Material Management
4. 4 CAEI Programmatic Engineering, Measurement, & Analysis (PEMA) contract: N65236-07-R-0080 Cost Plus Fixed Fee/Firm Fixed Priced Pricing Structure
Period of Performance: 8 year contract (one year base, 4 one-year option periods, and 3 award term years)
Stringent Organizational Conflict of Interest (OCI)
Scope of contract will provide programmatic support to include:
Engineering Analysis – tech reviews, independent studies, design reviews
Program/Project Management: EVM, ROI, QA, Risk management, financial management & planning
Measurement and Analysis – performance metrics, statistical analysis, process controls
Continuous improvement: ISO 9001, CMMI, LSS
Information Services
Anticipated start date: 1 December 2007
5. 5 Enterprise Platform Integration Contract (EPIC): N00039-07-R-0002 Contract issued out of SPAWAR HQ
SSC Charleston has ordering authority
CAEI (09C) as the trusted agent
Cost Plus Incentive Fee/Firm Fixed Priced Pricing Structure
Period of Performance: 8 year contract (5 year base period, with 3 one-year option periods)
Scope of contract encompasses:
SCN platform integration
SCN Platform Engineering
Procurement for SCN Platforms
Fabrication and assembly
Test
Limited installation of integrated C4I capabilities aboard new construction ships
The goal of this contract is to improve platform performance and reduce total costs to the Government
Anticipated start date: FY 2008 - 1st quarter/2nd quarter
6. 6 Mission Module or Production follow-on Cost-Plus-Incentive-Fee/Cost-Plus-Fixed-Fee/Firm Fixed Priced Pricing Structure
Period of Performance: 8 year contract (one year base period, 4 one-year option periods, and 3 award term years)
Scope of contract encompasses:
Equipment Rack Integration
Cable and Harness Fabrication
Pre-production and Kitting
Material Management
Anticipated start date: FY 2008 - 2nd quarter / 3rd quarter
7. 7 Platform (Sub) Integration Cost-Plus-Incentive-Fee/Cost-Plus-Fixed-Fee/Firm-Fixed-Fee Pricing Structure
Period of Performance: 8 year contract (one year base period, 4 one-year option periods, and 3 award term years)
Scope of contract encompasses:
Submarine C4ISR Integration (CSRR, and others)
Other related Platform integration work
CAEI and Code 53 initiative
Anticipated start date: FY 2008 - 2nd quarter / 3rd quarter
8. 8 C4ISR Tactical Vehicle Engineering & Integration Cost-Plus-Incentive-Fee/Cost-Plus-Fixed-Fee/Firm-Fixed-Fee Pricing Structure
Period of Performance: 8 year contract (one year base period, 4 one-year option periods, and 3 award term years)
Scope of contract encompasses the C4ISR integration in support of the MRAP, Humvee and any other tactical vehicles
CAEI and Code 61 initiative
Anticipated start date: FY 2008 - 2nd quarter / 3rd quarter
9. 9 Code 09C Contract Strategy
10. 10 Back-up
11. 11