An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting Our Challenges Together FY11 Q1 Scale July 2010

  2. Working towards meeting our challenges together FY11 Q1 3.92 million units Mac – 138k units, 4% iPod – 951k units, 24% iPhone – 903k units, 23% Accessories – 1464k units, 37% iPad – 468k units, 12% Channel – 3.1mil units, 78% Retail – 549k units, 14% AOS – 289k units, 7% • Forecast • Product Split • Customer Segment Split

  3. Storage analysis - Qtr Summary 3135 pallets 1802 shelves/locations Additional 309 pallets will be available based on true direct ship for iPhone’s • Assumptions • FY11 Q1 forecast • 2 weeks inventory on hand

  4. Storage analysis - Weekly • Assumptions • FY11 Q1 forecast • 2 weeks inventory on hand • FY10 Q1 spike Adequate space to execute Q1 • Additional Space for Rework/Storage – Samsung Yard (25 containers) • Empty Container Storage - $108 per container per week • Transport - $550 per container

  5. Yennora – Proposed layout Narrow Aisle Racking – 500 locations Bulk Storage – 750 sqm Move portables across Racking – 150 pallets Receiving Floor space – 200 sqm Racking – 450 pallets

  6. Action Plan – Short Term • Retail Solution layout change (RF) – deploy solution by end of Aug, efficiency gain of 10-15% (100 sqm) • Scrapping of obsolete stock – complete by end of Sep (50 pallets) • Relocation of Schenker pallets – complete by end of Sep (150 pallets) • Increase racking in front of the Localisation – complete by end of Sep (120 pallets) • Increased storage behind the Localisation area – complete by end of Sep (600 sqm) • Increase racking in RMA – complete by end of Sep (288 pallets)

  7. Action Plan – Short Term cont…. Invoice Matching Solution – deploy by end of Aug (quicker throughput – less staging space) AOS Packing Slip Elimination – deploy by end of Sep, efficiency gain of 10-15% Narrow Aisle Racking – complete by end of Sep (500 shelves/locations) Revised racking design – complete by end of Sep (100 pallets) Moving Portables – complete by end of Sep (200 sqm for receiving) Samsung Yard – available July (1000 sqm for storage / rework) Relocate 3PP receipts into bulk receiving area – (100 sqm for staging) Industrial Engineer – commencing study 5th of July Changes subject to joint review and Apple sign off

  8. Action Plan – Mid Term Confirmation by the end of Aug • Extra 2000 sqm at Yennora – 80% probability space will be available FY11 Q2 • Mezzanine over stage area – pending IE review • Fairfield Site – confirmation by 1st week of July • Wetherill Park Site - confirmation & Asset review by 1st week of July • Lease 2000 sqm in the Yennora area – short term lease at Yennora Rail Yard • Study commencing • 5th of July Not an option Negotiating Available now

  9. Meeting Our Challenges Together July 2010