FED Design and EMU-to-DAQ Test

FED Design and EMU-to-DAQ Test. J. Gilmore CPT Week DAQ Presentation Feb. 10, 2005. baseline. Detector Dependent Unit Receive data from DMB, Format data and send to DCC Detect and report errors Will build 50 boards (36 required). C R A T E C O N T

mayten
Download Presentation

FED Design and EMU-to-DAQ Test

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FED Design andEMU-to-DAQ Test J. Gilmore CPT Week DAQ Presentation Feb. 10, 2005

  2. baseline Detector Dependent Unit Receive data from DMB, Format data and send to DCC Detect and report errors Will build 50 boards (36 required) C R A T E C O N T R O L L E R D C C D D U D D U D D U D D U D D U D D U D C C D D U D D U D D U Data Concentration CardReceive data from DDUs, Merge & send data to DAQ Will build 10 boards (4 required) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 FED Crates (in USC55) optional • FED board dimensions are 9U x 220mm deep • EMU will have 4 FED crates (2 for each Endcap) • 9 DDUs plus 1 or 2 DCCs in a FED crate • Each DDU reads out 13 CSCs – 200 sector of Endcap

  3. DDU Data Inputs ME4 ME3 ME2 ME1 DDU Data Inputs • Each DDU reads out a 200 slice of Endcap - 13 CSCs (or 13 DMBs) • CSC sectors are rotated between stations to equalize input data rate between DDUs

  4. J1: Standard VME64x, for slow control J3: Custom for data transmission DDU DCC and for TTC control DDU DCC DDU DDU DCC DDU Custom Backplane for FED Crate • Designed for 9 DDU to 1 DCC or 2 DCCs • Each DCC can send data on 1 or 2 SLINKs • Can accommodate various data concentration ratios: • 9 DDU to 1 SLINK - EMU data on 4 SLINKs • 5 or 4 DDU to 1 SLINK - 8 SLINKs (baseline plan) • 3 or 2 DDU to 1 SLINK - 16 SLINKs (for S-LHC?) • 1 DDU to 1 SLINK - 36 SLINKs (for SS-LHC?)

  5. FMM output port VME FPGA Optical Fiber Input (15) Input FPGA Input FIFOs Main FPGA GbE To Local DAQ SLINK Mezz Board GbE FIFO DDU Prototype • Functions • Merge data from 13 DMBs • Perform error checking and status monitoring (CRC, word count, L1 number, BXN, overflow, link status) • Communicates w/FMM • Large Buffer Capacity • 2.5 MB buffer • Average DDU data volume estimated to be 0.4kB per L1A at LHC (@1034 lumi) • Buffer can hold over 6000 events • TTC signals from DCC • Slow control via VME

  6. VME SLINK Output FIFOs Input FIFOs Input FPGAs TTCrx Control FPGA SLINK DDU data J1 backplane DCC Prototype • Data Concentration • Merge data from 9 DDUs • send merged data to central DAQ via 1 or 2 SLINKs • Has two optional GbE spy data path • Fast Control • Receive TTC fiber signals using TTCrx, • Fanout L1A, LHC_clock and other TTC signals to DDUs • Has optional FMM interface GB Ethernet output

  7. EMU-to-DAQ Test Plans • Can CMS DAQ be used for EMU readout? • What rate can DAQ handle? • SLINK readout limitations (crate location & cable length) • Where does data go? • On-line checks? Data storage? Where & how much? • What rate can EMU provide? • Use cosmic triggers, calibration pulses/fake data, or both? • Before March 17 is good… • Current EMU FED system prototypes are available • Fully compatible with final production system • ~March 21 – April 12 is not so good. • EMU FED production work requires experts at OSU • April 14 or later? • Some new EMU FED boards will be available