An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMU FED: USC55 Hardware • 5 VME crates (9Ux220 mm) ordered and delivered (need 4) • 4 CAEN VME Crate Controllers ordered and delivered • Board Production finished • All 50 DDU boards (need 36) produced and tested – Feb 2006. • All 10 DCC boards (need 8) produced and tested – Jan 2006. • All 5 Custom Backplanes (need 4) produced and tested - 2005. • Shipping boards to CERN for USC55 installation • Ready to commission FED crates in USC55 any time

  2. EMU FED: Installation Summary • USC55 installation phases • FED Crates, DDUs & DCCs: ready now, 1 day of work • Fiber installation from UXC to USC, few weeks work • Ducts and mini-tubes will be installed in May-June • Fiber blowing to be done after +endcap is lowered, Aug-Sep • Fiber termination/patch panels: 1-2 weeks, Sep-Nov 2006 • Peripheral Control Network, GbE switches • 1-2 days work, after fiber is installed • Crate control computers are in hand • Currently in use at SX5 for MT/CC • Available manpower: 2-3 FTE as needed • Timeslot for EMU in MS Project File OK (July-Nov)