40 likes | 49 Views
Requesting funds of $200,000 to complete the electrical infrastructure project, upgrading switchgear, breaker boxes, and system capacity. Urgent as current parts are no longer manufactured. Project to be funded over two years as part of a 5-year plan, started in FY18. Includes new fire alarm system along with HVAC replacement. This will address the outdated Federal Pacific panel with functional but obsolete components and ensure the system is up to date with present technology requirements.
E N D
FY19 Capital Project Proposal Electrical Infrastructure Project Completion Requested Funds: $200,000
Electrical Project Completion • Project in 5-year plan to be funded over two years • Upgrade to switchgear, breaker boxes, system capacity • Current systems parts no longer manufactured • In FY18 initial half of $200,000 awarded • Project will be in progress at beginning of FY19 • New fire alarm system included in this project concurrent with HVAC replacement
Westinghouse products have not been produced since 1997 Please note the engraved date on the Federal Pacific panel.
THIS IS CURRENTLY FUNCTIONAL. FUNDS WILL COMPLETE THIS UPGRADE FOR PANELS TO GO WITH NEW HVAC SMOKE DAMPENERS SWITCHGEAR MAIN POWER HANDLE. TAKES FUSES ABOUT THE SIZE OF A LOAF OF BREAD WHICH ARE NO LONGER AVAILABLE FOR PURCHASE