1 / 32

SYSTEMWIDE SUPPORT

SYSTEMWIDE SUPPORT. WHO WE ARE. OFFICE OF THE BOARD OF REGENTS. OFFICE OF THE PRESIDENT. ACADEMIC PLANNING & POLICY. ADMINISTRATION. BUDGET & FINANCE/CFO. CAPITAL IMPROVEMENTS. CAREER & TECHNICAL EDUCATION. EEO/AA. LEGAL AFFAIRS. INFORMATION TECHNOLOGY SERVICES. RESEARCH.

Download Presentation

SYSTEMWIDE SUPPORT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SYSTEMWIDE SUPPORT

  2. WHO WE ARE OFFICE OF THE BOARD OF REGENTS OFFICE OF THE PRESIDENT ACADEMIC PLANNING & POLICY ADMINISTRATION BUDGET & FINANCE/CFO CAPITAL IMPROVEMENTS CAREER & TECHNICAL EDUCATION EEO/AA LEGAL AFFAIRS INFORMATION TECHNOLOGY SERVICES RESEARCH STUDENT AFFAIRS EXTERNAL AFFAIRS & UNIVERSITY RELATIONS

  3. Repair, Renewal, & Replacement Priorities FB 2009-2011 The System has two requests pursuant to the instructions for stocktaking and preparation. Repair, Renewal and Replacement: a. To support RR&R systemwide b. Modernization – Kuali Request These requests tie to the Strategic Outcome - Resources and Stewardship – to make repairs & maintenance a top priority in budget planning, and to exercise exemplary stewardship over all of the University’s resources for a sustainable future.

  4. Systemwide Maintenance Backlog and Capital Renewal Requirements

  5. Systemwide Maintenance Backlog Current Maintenance Backlog UHM $242.754 Million UHH $40.467 Million CCS $68.273 Million Total $351.494 Million

  6. Systemwide Maintenance Backlog 6 Year Average Requirement to Eliminate Backlog $351.494 Million / 6 Years = $58.582 Million UHM $40.459 Million UHH $6.745 Million CCS $11.378 Million Total $58.582 Million

  7. Capital Renewal Requirements 6 Year Average Requirement UHM $43.993 Million UHH $4.733 Million UHWO $0.059 Million CCS $9.897 Million Total $58.682 Million

  8. Average RRR Over 6-Years • Elimination of Backlog $58.582 Million • Capital Renewal $58.682 Million Total $117.264 Million

  9. RRR Operating Budget Requirements

  10. Base Assumptions • All Campuses Plan to Eliminate Maintenance Backlog by 2015 • All Campus Renewal Requirements will be Financed • Capacity of Existing Offices for RRR is $38.5 Million • UHM $28.0 Million • UHH $3.5 Million • CCS $7.0 Million

  11. RRR Impacted Offices • Impacted Offices Include: • UHM Facilities Planning and Management • UHH Facilities Planning and Construction • CCS Physical Facilities, Planning, and Construction • SYS Office of Capital Improvements • SYS Office of Procurement and Real Property Management • SYS Disbursing

  12. Facilities RRR Workload Increase • Capacity of $38.5 Million/Year • Capital Renewal Requirements of $58.7 Million/Year • Workload Increase of 53%

  13. System RRR Workload Increase • Capacity of $38.5 Million/Year • Capital Renewal and Backlog Requirements of $117.3 Million/Year • Workload Increase of 205%

  14. Repair, Renewal, and Replacement Operating Budget Needs • UHM Registered Architect/Engineer • 5.0 Positions at $79,428 Each • UHH Registered Architect/Engineer • 1.0 Position at $79,428 • CCS Registered Architect/Engineer • 2.0 Positions at $79,428 Each • SYS OCI – Administrative Officer • 1.0 Position at $60,204 • SYS Procurement – Procurement Specialist • 1.0 Position at $60,204 • SYS Disbursing – Pre-Audit Clerk • 1.0 Position at $37,968

  15. Summary of Operating Budget Requirements • Personnel • 11.0 Positions $793,800 • Other Current Expenses • Recurring $12,704 • Non-Recurring $39,996 • Total Request $846,500

  16. BUDGET REQUEST FOR INCREASED RR&R

  17. Need to Replace Financial System for UH • UH’s current financial management information system (FMIS) is no longer supported by Software AG since 1997 • UH is on our own for all support • FMIS is no longer repairable to meet the University’s on-going fund accounting requirements • Running out of account codes, school codes, etc. • Budget and financial data is necessary for timely internal financial information and compliance, and to produce financial statements for audit purposes • UH’s financial management system supports all 10 campuses, all PI’s and over 122 AO/FOs • 2,715 authorized FMIS users

  18. Need to Replace Financial System for UH (cont.) • UH’s financial management systems produces and records: • FY 2007 over 5,689,323 transactions • More than 60,000 Pcard transactions/year • 6,400 travel documents/year • 40,000 purchase orders/year • 5,000 electronic funds transfer documents/year • Maintains 59,068 accounts • Services 195,750 active vendors

  19. Why Kuali Financial System for UH • Integrated budgeting & financial management • e.g. encumbrance of payroll for budgeting purposes • Embedded Workflow for all transactions • Electronic attachments as needed • Based on common higher education business practices • Integrated management of contracts & grants • Web access to all functions • Shared investment in upgrades • Compliance changes and new services • Modern open technology • Reduces vendor lock-in

  20. KUALI BUDGET REQUIREMENTS • IT Systems Administrator • 2.0 Positions at $75,000 Each • IT Database Administrator • 1.0 Position at $85,000 • IT Applications Database Admin • 1.0 Position at $85,000 • IT Developers • 4.0 Positions at $75,000 Each • FMO Information Technology Specialist • 1.0 Position at $60,204 • FMO Business/System Analysts • 7.0 Temporary Positions at $60,204 Each FY2010 • 2.0 additional Temporary Positions at $60,204 FY2011

  21. BUDGET REQUEST FORKUALI REPLACEMENT

  22. CIP Budget Requirements

  23. CIP Budget Requirements – Fiscal Biennium 2009-2011 • Major CIP Planning • Public/Private Partnership Studies • University of Hawai‘i Project Adjustment Fund

  24. Major CIP Planning • Long Range Development Plans • UHM LRDP Update ($1.000 Million) • UHH Kalākaua Marine Education Center at Puakō LRDP ($250,000) • MAU Moloka‘i Education Center LRDP ($100,000)

  25. Major CIP Planning • Infrastructure Studies • UHM Infrastructure and Utility Master Plan ($1.700 Million) • UHH Infrastructure and Utility Master Plan ($400,000)

  26. Major CIP Planning • Project Development Reports • UHM Research Facility ($1.100 Million) • UHH College of Pharmacy ($500,000)

  27. Major CIP Planning • Other Facility Planning Studies • SYS Comprehensive Development Strategies for Major Rehabilitation of Buildings ($500,000) • SYS Comprehensive Forensic Engineering Assessment Studies for Major Renovations ($500,000) • SYS Other Planning Studies ($200,000)

  28. Public/Private Partnership Studies • Feasibility Studies • 4 Studies - $800,000 • Appraisal Reports • 4 Reports - $400,000 • Highest and Best Use Land Utilization Studies • 8 Studies - $400,000 • Entitlement Assessments • 8 Studies - $400,000 • Conceptual Master Planning • 2 Studies - $200,000 • Conceptual Design Alternatives • 4 Studies - $600,000

  29. University of Hawai‘i Project Adjustment Fund • To Enable the Transfer of Unrequired Project Balances to Account for Transfer to Other University Projects • Nominal Amount of $4,000 for CIP Elements of Plans, Design, Construction, and Equipment

  30. CIP Request Summary

  31. Replacement/Refresh of Information Technology Facilities and Emergency Operations Center (EOC) for Disaster Resilience • Replacement facility will dramatically improve availability of mission-critical information and communications capabilities serving entire UH system and students/faculty/staff on all islands • UH’s first EOC will support executive response to natural and man-made disasters • Significant improvements in sustainability by placing “energy hogs” in appropriate facilities for the first time • Will enable other renovations to proceed as scheduled, e.g., 50+ year-old Keller Hall scheduled for next biennium • $50.6m requested for construction • $4.7m already appropriated • Design underway and due for completion during FY09

  32. QUESTIONS?

More Related