Draft Conceptual Plan - Pillar Point to Mirada Surf

Draft Conceptual Plan - Pillar Point to Mirada Surf. January, 2009. California Coastal Trail Draft Conceptual Plan Moss Beach to Mirada Surf. Trails Team Goals Establish the route based on best available alternative. Identify & work on implementing needed improvements .

melody
Download Presentation

Draft Conceptual Plan - Pillar Point to Mirada Surf

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft Conceptual Plan - Pillar Point to Mirada Surf January, 2009

  2. California Coastal Trail Draft Conceptual Plan Moss Beach to Mirada Surf

  3. Trails Team Goals • Establish the routebased on best available alternative. • Identify & work on implementing needed improvements . • Identify long term options. • Steps taken • Walk the route • Review previous trail studies • Consult Harbor District, Coastwalk, DPW, California Coastal • Conservancy • Midcoast Parks & Recreation Committee approval • Solicit public feedback - now

  4. 1. Pillar Point parking lot 2. Pillar Point Marsh 3. Princeton waterfront 4. Capistrano corner lot 5. Capistrano Rd./ beach 6. Harbor docks 7. Inner harbor beach 8. Outer harbor south 9. Surfer Beach day-use lot 10. Surfer Beach 11. Coronado/ Hwy 1 intersection 12. Mirada Surf West

  5. Pillar Point to Denniston Creek: West Point Ave. – Princeton Ave. – Broadway – Prospect Way and beach alternate route

  6. Pillar Point Marsh beach alternative via West Shoreline Access Trail

  7. Pillar Point Marsh via West Point Ave. • Prune willows for visibility/safety. • Create separate pedestrian trail. • Signage should show beach alternative.

  8. Princeton Shoreline Princeton Shoreline Improvement Project is based on a 2001 feasibility study by the Harbor District of various methods to provide a uniform erosion control structure, beach nourishment by harbor dredging, and a shoreline coastal trail. No progress has been made to implement the plan since no government entity has stepped forward to be the lead agency. Princeton Ave. is currently the CCT alternative closest to the shoreline. Four short road stubs connect Princeton Ave. to the shoreline for views and possible beach access: West Point, Vassar, Columbia, Broadway.

  9. 2002 Coastal Access Plan for ramp to beach & landscaping at Vassar – shows Princeton Ave. as CCT alignment, with beach as alternate route.

  10. Columbia: Improve shoreline access

  11. Princeton shoreline

  12. Denniston Creek to Boat Launch ramp

  13. Prospect Way Bottleneck at Denniston Creek culvert between guard rail & parked cars

  14. Capistrano corner lotinformal trails along the creek & harbor edge

  15. Capistrano Road at beach

  16. Harbor docks

  17. south edge of harbor dock inner harbor beach

  18. Boat Launch Ramp to Mirada Surf

  19. Outer harbor beach south – trail complete

  20. Surfers’ Beach