1 / 13

AB-LTC Technical Review

AB-LTC Technical Review. Extraction Protection Elements, TCDS, TCDQ. Wim Weterings Contributions from Brennan Goddard Marta Sans Merce Benoit Riffaud Marcel Gyr. Outline. Introduction TCDS – TCDQ Concept Technical Solutions Planning Status & Conclusion. Introduction.

merrill
Download Presentation

AB-LTC Technical Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AB-LTC Technical Review Extraction Protection Elements, TCDS, TCDQ. Wim Weterings Contributions from Brennan Goddard Marta Sans Merce Benoit Riffaud Marcel Gyr

  2. Outline Introduction TCDS – TCDQ Concept Technical Solutions Planning Status & Conclusion

  3. Introduction TCDS:Fixed diluter block to protect the MSD Septa in the event of an asynchronous firing of the MKD kickers. TCDQ: - Mobile diluter block to protect Q4 magnets in the event of an asynchronous firing of MKD kickers.- Protects the arc at 450GeV and the triplet apertures at 7TeV from small impact parameters bunches.

  4. (Some) Design Parameters • TCDS - Dilute about 6.1 MJ of energy, ~ 1.7% of the energy contained in the LHC beam at 7 TeV. • TCDS - Max. 300°C in MSD vacuum chamber and max. 100°C in the MSD Yoke. • TCDS - Aperture for circulating beam (n1≥ 6.5) • TCDQ - Max. energy deposition in Q4 of ~100 J/g. • TCDQ movement 15 mm (10σ at 7TeV and 450GeV)withprecision of 0.25mm (0.5 σ at 7TeV). • Nominal vacuum pressure of <10-8 Pa. • Assure a low transverse machine impedance. • Limit radiation exposure of personnel.

  5. TCDS Concept Functional Specification LHC-TCDS-ES-0001 (EDMS 393973) 0.5m Ti 4.5 g/cm3 1m AlN 3.31g/cm3 1m Graphite 1.77 g/cm3 2m Carbon Composite 1.4 g/cm3 1.5m Graphite 1.77 g/cm3

  6. TCDS Technical Solution MSD • Two 3 meter long vacuum tanks – Ø250mm. • Two sublimators and two 400l/s ion pumps/tank. • ~500mm for interconnection. • Independent supports with 3 point alignment.

  7. TCDS Technical Solution Absorber Blocks CirculatingBeam ExtractedBeam

  8. TCDS Planning

  9. TCDQ Concept Functional Specification LHC-TCDQ-ES-0001 (EDMS 01/2004) • Initial MARS simulations resulted in a 10m C + 1m Fe structure.(N. Mokov et al., Fermilab, FN-0724) • Iterations in FLUKA are ongoing with Q4 implemented in geometry.(M. Sans Merce AB/ATB) • Preliminary results favour a ‘TCDS-Type’, but longer, structure.

  10. TCDQ Technical Solution Absorber Block TCDS TCDQ Motorisationsystem CirculatingBeam

  11. TCDQ Planning

  12. Status & Conclusion • TCDS Functional Specification approved, TCDQ Functional Specification to be approved 01/2004. • One full time designer is working on the project, with an additional designer starting 01/2004. • Assembly and construction options (in-house vs outsourced) presently being studied in the light of group reçourses and priorities. • Advancement is still according to work unit planning, TCDQ schedule tight but still feasible (no room for delays).

  13. Status & Conclusion • No problems anticipated for the CtC. • No problems anticipated to reach the design parameters. • EDMS / Hardware baseline documentation minor, but present. • Integration studies in collaboration with ICL have started. • Installation issues have not yet been looked at.