This photo collection showcases the stream realignment project on the South Branch of 18 Mile Creek in Boston, NY. The purpose of the project was to protect the new plastic bridge. The photos highlight various features such as meanders, grade control structures, bendway weirs, and bank protection. The photos also show the before and after scenarios, including the instability upstream of the project and the successful implementation of the Funnel Concept.
E N D
South Branch of 18 Mile Creek, Boston, NYStream realignment to protect the new PLASTIC BRIDGE
Looking US. White line delineates high flow thalweg trace. High flow
Looking further US at rock bank protection, two Bendway Weirs, and further US a grade control structure. 6/9/2006
Looking DS during high water, nice meander “S” bend 1/13/2006. Note white water at grade control
Aerial photo, looking DS, note instability upstream of project 5/18/2005
Plastic Bridge Flow toward upper left corner of photo. Note instability US 1/13/2006
Another look DS, note Funnel Concept as built (red lines) 1/13/2006