1 / 10

SCHOOL BUILDING PROGRAMME

This presentation outlines the background, location, programme budgets, socio-economic impact, and photos of the Accelerated Schools Infrastructure Delivery Initiative (ASIDI) and EC Schools Building Programme (ECSBP) by the National Department of Basic Education (DBE) and Provincial Department of Education (DoE).

mgary
Download Presentation

SCHOOL BUILDING PROGRAMME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCHOOL BUILDING PROGRAMME DoE - EC / ASIDI Portfolio 24 May 2013

  2. OUTLINE OF THE PRESENTATION • Background • Location • Programme Budgets • Socio – economic Impact • Photos

  3. BACKGROUND The Accelerated Schools Infrastructure Delivery Initiative (ASIDI) and EC Schools Building Programme (ECSBP) are an initiative of both the National Department of Basic Education (DBE) and Provincial Department of Education (DoE) to address the backlogs in the eradication of inappropriate school structures and in the provision of basic services to schools that do not have such services. These services include water, sanitation and electricity. These Programmes are seen against the background of inadequate and poor physical infrastructure in the schools and the government’s desire to bring all schools in the Province to an adequate standard to ensure that the facilities are conducive for effective teaching and learning.

  4. LOCATION – ASIDI

  5. PROGRAMME BUDGET (2013/14) – ASIDI PROJECTS

  6. PROGRAMME BUDGET (2013/14) – DOE - EC

  7. SOCIO ECONOMIC IMPACT

  8. Photos (Dumba JSS – 3 classroom Block)

  9. PHOTOS (Cont……)

  10. THANK YOU!!!!

More Related