DArT integration in ArDM Update

DArT integration in ArDM Update. 13 february 2019 Luciano Romero. DArT system. Cable connections CF63 1x25 or 2x25. External connections CF200 flange Pipes D40 & D8 Cu/ Inox interface DArT. Cable reservoir. Vacuum port CF40. Gas outlet. Gas inlet. CF200.

mhood
Download Presentation

DArT integration in ArDM Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DArTintegration in ArDMUpdate 13 february 2019 Luciano Romero

  2. DArTsystem Cable connections CF63 1x25 or 2x25 • Externalconnections • CF200 flange • Pipes D40 & D8 • Cu/Inox interface • DArT Cable reservoir Vacuumport CF40 Gas outlet Gas inlet CF200

  3. Cu/Inox interface, softwelding • D40x1.5 and D8x1 inox pipes. • CF40 and ferruleunions. • The Cu/Inoxweldedbysilverbrazing. • D22x1 and D6x1 copper pipes. • 200 mm awayfromDArT.

  4. Mechanicalupdates of DArT • Mechanical interface of SiPM • The interface can supporttwotypes of PCB. • PCB with 2 screws at a distance of 26 mm. • PCB with 4 screws in a rectangle of 19x14 mm. • New dimensions of DArTmechanics • Marcinrequested a modification of thedimensionsto optimizeacrylicsupply. • Wehave no problemswiththat. • Designalreadymodified.