An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CANARIE-ORANO ROADM Update Marc Boulerice - C4 Tech - June 11, 2006

  2. Overview • Building ROADM from Chicago to NYC, via Detroit-Windsor, Toronto, Ottawa, Montreal, Albany, Boston • Deploying Nortel CPL (Common Photonic Layer), 50Ghz spacing, C-band, 72 10Gb channel capacity • 20 year IRU with Level3 on fibre pair from Chicago to Detroit and Toronto to NYC • 17 year IRU with Telus on fibre pair between Detroit and Toronto • 37 sites total (including 3 glass-throughs)

  3. Why are we doing this? • High link allocation • Toronto – NYC • Chicago – Toronto • Toronto – Ottawa • Ottawa – Montreal • Low cost of expansion • Great opportunity to acquire fibre and build toward possible CAnet 5

  4. Layer 1 Topology (1)

  5. Layer 1 Topology (2)

  6. sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 sCMD8 Planned Channels Chicago Starlight Toronto 151 Front New York MANLAN DetGW Ottawa3R Montreal3R G7C1 G7C1 G7C1 G7C1 G7C2 G7C2 G7C2 G7C2 sCMD8 G7C2 G7C3 G7C3 G7C3 G7C4 G7C4 G9C1 G9C1 G7C5 G7C5 G9C2 G9C2 sCMD8 G7C6 G7C6 G7C7 G7C7 G6C1 G6C1 G6C1 G6C1 G6C1 G6C1 G6C1 G6C1 sCMD8 sCMD8 G6C2 G6C2 G6C2 G6C2 G6C2 G6C2 G6C2 G6C2 Fut. sCMD8 sCMD4 sCMD8 sCMD4 sCMD8 Windsor Public Library sCMD8 sCMD8 Fut. G9C1 G9C2 Ottawa City Hall RISQ PoP G7C6 G7C3 G7C5 G7C4 G7C1 G7C2 G7C6 G7C7

  7. Co-management • Using phased approach, as CANARIE gains experience • CANARIE/ORANO co-managed between Windsor Public Library and Ottawa City Hall • Current plan is that ORANO owns 25% of network capacity (18 λ) from Windsor to Ottawa

  8. Fibre Delivery Status

  9. Deployment Status • All Site Surveys (except Montreal QIX) completed • Final design validation is awaiting Fibre Characterization of Detroit-Chatham, 151Front-Tor3R segments • 151Front-Tor3R – completion expected week of June 12th • Detroit-Chatham – August 24th to September 11th (escalated) • Current plan is to deploy in 2 stages • 2 segments - StarLight to WPL and 151Front to MANLAN • Connect both segments - Nortel to redeploy and re-tune when Detroit-Chatham and both Ottawa (mid-Sept) and Montreal (mid-Aug) spurs available

  10. Next Steps? • Planning similar build with BCnet and Netera in Western Canada