150 likes | 230 Views
INSPIRE THEMATIC WORKING GROUP Production and Industrial Facilities (PF). Edinburgh, Scotland 30 June 2011. The group. Claudia “THE Editor” Pegoraro. Angel “Tres Sombreros” Lopez. EDITOR (From Feb 2010). EDITOR (2010) / P.O.C. Heinrich “Level of detail” Geerling. EXPERT. Andrea
E N D
INSPIRE THEMATIC WORKING GROUPProduction and Industrial Facilities (PF) Edinburgh, Scotland 30 June 2011
The group Claudia “THE Editor” Pegoraro Angel “Tres Sombreros” Lopez EDITOR (From Feb 2010) EDITOR (2010) / P.O.C Heinrich “Level of detail” Geerling EXPERT Andrea “what’s your main occupation” Giacomelli Antonello “IPPC” Navarretta EXPERT FACILITATOR
Input 1. User survey documents + core INSPIRE reference material 2. Expert-derived documents (directly used by experts in their other job or from their contacts) 3. Other EU projects
Activity tracking (R.O.M.) apr 2010 – jun 2011 Meetings (face-to-face or remote) INSPIRE progress
Output 1. A UML model 2. The data specification (model + use cases) 3. Increased insight on the data specification process
The Model (1/4) SITE FACILITY PLOT BUILDING (link to BU) INSTALLATION ADDRESS (link) INSTALLATION PART OPERATOR
The Model (2/4) Technical Unit
The Model (3/4) ACTIVITY Production process Process output Process input Emission Substance Energy Waste Product
Cross-theme relationships Administrative Units Cadastral parcels Addresses Land Use …as explicit Relationships… Area Mgmt.
Key changes from v1.0 to v2.0 A dedicated editor (with prior experience on Annex I) A common model for the “Facility” A productive Winter INSPIRE progress 10
Parts to be surely improved Use Cases Energy production facilities Off-shore facilities Statistical applications of PF data (e.g. statistical business registers) Planning INSPIRE progress 11
Interesting topics • Temporal aspects (change in use of facilities) • What about the production process (IN or OUT of scope ? Different views exist and are not currently reconciled)
Please note…… Page VI …and a couple of other similar notes in the text
Next steps • K.I.S.S. • Next teleconference: July 8 • “recruitment” of testers/reviewers • Prepare to receive comments • Follow “revamped” facilitation strategy (defined in May in an informal meeting in Torino and shared with all other TWGs).
If you don’t register to be a tester or reviewer (for any of the groups), please tell us why Andrea Giacomelli - info@pibinko.org