170 likes | 350 Views
Intelligent Energy Europe (EIE) / PV Policy Group – EIE/04/058/S07.38564. The PV Policy Group Project SECOND THEMATIC WORKING GROUP MEETING Friday 05 May 2006- in Athenes, Greece Presentation Monitoring European Position Paper and Action Plan F. JUQUOIS, C. URBSCHAT, A. VEIGEL, I. WEISS.
E N D
Intelligent Energy Europe (EIE) / PV Policy Group – EIE/04/058/S07.38564 The PV Policy Group Project SECOND THEMATIC WORKING GROUP MEETING Friday 05 May 2006- in Athenes, Greece Presentation Monitoring European Position Paper and Action Plan F. JUQUOIS, C. URBSCHAT, A. VEIGEL, I. WEISS
European Position Paper – Key question • Who are the relevant users of a European wide PV monitoring system and therefore which are the relevant key data to be monitored? • If target groups and key data are defined: What are best data collection methods to get the respective data? • If data collection methods are designed: Who is suitable to be in charge managing the whole monitoring system nationally and at European level? • data interpretation and communication PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper – Target groups and key datas PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper – Target groups and key datas PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper – key data for policy monitoring PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper –key data for Market Monitoring PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper –key data PV Sector monitoring PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper – data collection (germany) PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper – data management • who will be the national administrative body running the monitoring system nationally and collect/serve the national target groups with data? • and who will run the whole aggregate system on an European level? PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper – data communication • Centralized internet database • Should we use a centralized internet database also to COLLECT data? PV Policy Group – 2nd Thematic Working Group Meeting
Joint Position Paper and Action Plan MonitoringWhat input do we need from National Position Papers? • 1. Present status of national monitoring system • Based on the work already done in 2005 for National profiles the national PV Policy project partners should describe their present national PV monitoring systems in depth • by listing all nationally researched key data • its data collection methods and data sources • institutions responsible for data management • and ways of data communication. • An effective way is to fill in the following tables for taks force monitoring: * Green Power Balance group representative, which is the institution in charge of managing the promotion scheme of the Green Electricity Act.
Annex of National Position Paper – present status „Policy monitoring“ * Green Power Balance group representative, which is the institution in charge of managing the promotion scheme of the Green Electricity Act.
Annex of National Position Paper – present status „Market monitoring“ * Green Power Balance group representative, which is the institution in charge of managing the promotion scheme of the Green Electricity Act.
Annex of National Position Paper – present status „Industry monitoring“ * Green Power Balance group representative, which is the institution in charge of managing the promotion scheme of the Green Electricity Act.
Joint Position Paper and Action Plan MonitoringWhat input do we need from National Action Plans? • 2. Action Plan to improve national monitoring systems • Based on the output guidelines the national PV Policy project partners should describe their national actions for improvement of national monitoring in depth by using the following structure: • Short description of action goals (based on National Position Paper) • 2. Description of respetive working tasks for implementation • 3. Description of partners for implementation and their roles • 4. Timing and definition of ressources needed task by task (see 2.) • 5. Aspects of financing * Green Power Balance group representative, which is the institution in charge of managing the promotion scheme of the Green Electricity Act.
European Position Paper – Action plan • Identification of the national contact responsible for the feed in contract, • Checking of the legal possibility for a mandatory European identification number, • Issuing letter of intention from those national contact, • Drafting a proposal aiming at conceiving a European monitoring database. PV Policy Group – 2nd Thematic Working Group Meeting
European Position Paper – Action plan • Participants: 8 Energy agency + Relevant ministry (40 000 € + 10 000 €)*16, • 1 consultant with database experience (50 000 €), • 1 developer ( 100 000 €), • 1 structure to make the database sustainable (business model), (50 000 €) • Total budget: 1 M€, • Duration: 2 years. PV Policy Group – 2nd Thematic Working Group Meeting