1 / 12

Aeronautical Information Services (AIS) Data Link

RTCA SC-206/EUROCAE WG-44/53. Aeronautical Information Services (AIS) Data Link. Weather in the Cockpit (WIC) August 9, 2006. Ernie R. Dash Raytheon (FAA FISDL). AIS and Met Data Link Services. Joint RTCA SC-206/EUROCAE WG-44/53 tasks:

milt
Download Presentation

Aeronautical Information Services (AIS) Data Link

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTCA SC-206/EUROCAE WG-44/53 Aeronautical Information Services (AIS) Data Link Weather in the Cockpit (WIC) August 9, 2006 Ernie R. Dash Raytheon (FAA FISDL)

  2. AIS and Met Data Link Services • Joint RTCA SC-206/EUROCAE WG-44/53 tasks: • Define requirements for AIS and Met Data Link Services • Develop necessary data link system “standards and approval” documentation • Insures standardization and interoperability • Organized into two Subgroups • AIS Subgroup • Met Subgroup • Meetings • Meet quarterly, Alternate between Europe and US • 1st Meeting: July 2006 • 6th Meeting: RTCA/Washington DC, 11-15 September • Approach • Follow guidelines for approval of Air Traffic Service data link communications

  3. RTCA DO-264 / EUROCAE ED-78“Guidelines for Approval of the Provision and Use of Air Traffic Services Supported by Data Communications” • Provides guidance and templates for “Minimum Acceptable Criteria” needed to support “Approvals” • Approvals include: • Operator Operational Approval (i.e., Ops Specs, AC) • Aircraft Type Design Approval (i.e., TSO, STC) • ATS Provider Operational Approval (?? – a “New Cat”) • Minimum Acceptable Criteria are provided as either: • Process Objectives, and/or • Guidance for Evidence (that the Process Objective was met) • Key Process Objectives include: • OSED – Operational Services and Environment Definition • SPR – Operational Safety and Performance Requirements • OSA – Operational Safety Assessment • OPA – Operational Performance Assessment • INTEROP – Interoperability Requirements

  4. AIS / MET OSEDs – Drafts in Progress • AIS Data Link Services – (Uplink – Combined into one OSED) • NOTAM Text • NOTAM Graphic • AIRAC Cycle – Complete • AIRAC Cycle – Updates • Non-AIRAC Cycle – Complete • Non-AIRAC Cycle – Updates • MET Data Link Services – (Potential for two separate OSEDs) • Ground MET Data (Uplink) • Aircraft MET Data (Downlink/Crosslink)

  5. Met OSED Challenges (Uplink) • Defining specific ground Met products required to perform cockpit functions • Three classifications of pilot use or cockpit application identified • Planning Decisions (greater than 20 minutes up to two hours or more) • Near-Term Decisions (1-20 minutes) • Reactive Decisions (immediate to less than 1 minute) • Candidate METLINK products are classified relative to the pilot use or cockpit application • Defining the required timelines for data link communications and cockpit receipt • Little/no ICAO Annex 3 guidance • Especially new (potential) products

  6. Pilot Use / Cockpit Application

  7. Candidate METLINK Products P = Planning Decision Product N = Near-Term Decision Product R = Reactive Decision Product

  8. Future Product (?): AWC – ADDS - Icing FYI/Help • Current/Forecast Icing Potential (CIP/FIP)     [ CIP Performance Statistics ]     [ FIP Performance Statistics ] 0200 UTC CIP0200 UTC CIP-SLD0300 UTC FIP0400 UTC FIP0600 UTC FIP0900 UTC FIP1200 UTC FIP • See more detailed CIP/FIP plots in the Java Flight Path Tool • Freezing level graphics:0-hour3-hour6-hour9-hour12-hour • Current Icing advisories: • Pilot reports of Icing:

  9. Data Link Service Criteria Broadcast

  10. RCTP Communications Time Criteria: METLINK Planning (and Near-Term) Products • Notes: • 1. Initiator = Pilot or Avionics • 2. Responder = Met Data Hub; Met Service Provider populates the Hub with appropriate data (see Note 3) • 3. Met Data classified according to each category of service: • Planning Decision Support • Near-Term Decision Support • Reactive Decision Support • RCTP Transaction Times based on published criteria for D-ATIS (Ref: DO-290/ED-120: Safety and • Performance Requirements for Air Traffic Data Link Service in Continental Airspace, Table 1, page 211)

  11. Service Time Constraints COCR Version 1.0: Pg 85/Table 5-3 DO-290/ED120: Pg 211/Table 1

  12. Summary • AIS and MET Data Link Services being defined • Minimal existing ICAO / WMO (or FAA) guidance that may be applied to defining OSED criteria • Feedback / input from WIC Workshop welcome • Many RTCA SC-206/EUROCAE WG-44/53 Members attending WIC including : • MET Subgroup Chair: Rocky Stone (United Airlines) • Meetings open for all to attend • Proceedings posted on website: http://www.avmet.com

More Related