The F acility for A ntiproton and I on R esearch. F acility for A ntiproton & I on R esearch. Nuclear Structure & Astrophysics (Rare-isotope beams). Hadron Physics (Stored and cooled 14 GeV/c anti-protons). SIS18. p-Linac. SIS100 /300. UNILAC. QCD-Phase Diagram
E N D
The Facility for Antiprotonand Ion Research NuPECC, FZ Jülich, 15/3/13
Facility for Antiproton & Ion Research Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics (Stored andcooled 14 GeV/c anti-protons) SIS18 p-Linac SIS100/300 UNILAC QCD-Phase Diagram (HI beams 2 to 45 GeV/u) HESR Rare-Isotope Production Target Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Anti-Proton Production Target Dense Bulk Plasmas (Ion-beam bunchcompression & petawatt-laser) CR &RESR Cryring NESR Materials Science & Radiation Biology (Ion & antiproton beams) 100 m Accelerator Physics NuPECC, FZ Jülich, 15/3/13
Staging 2018 NuPECC, FZ Jülich, 15/3/13
Modularised Start Version M0 M3 M1 M3 M2 CBM/HADES APPA Experiments M1: APPA M1: CBM/HADES M2: NuSTAR M3: PANDA PANDA NuSTAR NuPECC, FZ Jülich, 15/3/13
Costs MSV in 2005 € (inflationescalationuntil 2018: ca. +50%) * Total experimental end stations (excluding Super-FRS): ca. 210 M€ (2005) = 315 M€ (2018) NuPECC, FZ Jülich, 15/3/13
FAIR Member States • All numbers in 2005 € • (escalationuntil 2018 ca. +50%) • UK Associated Membership from 3/5/13 • Spain expectedtojoinsoonas a member • Talks with China on Associate FAIR Member status • Talks withItaly • Additional contributionstoexperiments NuPECC, FZ Jülich, 15/3/13
Civil Construction Synchrotrons: 1.1 km With beamlines: 3.2 km Existing SIS 18 Total area > 200 000 m2 Area buildings ~ 98 000 m2 Usable area ~ 135 000 m2 Volume of buildings ~ 1 049 000 m3 Substructure:~ 1500 pillars, up to 65 m deep NuPECC, FZ Jülich, 15/3/13
What will be Visible in the End NuPECC, FZ Jülich, 15/3/13
...with complex interior Central Switchyard Building 36 m down into the ground NuPECC, FZ Jülich, 15/3/13
Building Permit Darmstadt Councilor Brigitte Lindscheidhanding over the FAIR building permit (21 folders) to FAIR management at the end of Oct. 2012 Submission of 771 folders building application to Darmstadt’s civil construction authority in Aug. 2011 NuPECC, FZ Jülich, 15/3/13
Aerial View Jan. 2013 13.01.2013 NuPECC, FZ Jülich, 15/3/13
Webcam March 2013 NuPECC, FZ Jülich, 15/3/13
Roadmap Civil Construction NuPECC, FZ Jülich, 15/3/13
Accelerator Challenges Compact & cost effective accelerators Fast cycling superconducting magnetsdB/dt~ 4T/s Precision beams Electron & stochastic cooling XHV @ high beam intensities Extremely high vacuum ~10-12mbar Fast acceleration High gradient, variable frequencyFerrite & MA loaded cavities NuPECC, FZ Jülich, 15/3/13
Superconducting Magnets SIS100 dipole magnets Coil production by BNG SIS100sextupole magnets Dubna prototype NuPECC, FZ Jülich, 15/3/13
HESR Layout Main machine parameter Momentum range 1.5 to 15 GeV/c Circumference 575 m Magnetic bending power 50 Tm Dipole ramp 25 mT/s Acceleration rate 0.2 (GeV/c)/s Geometrical acceptances for βt = 2 m horizontal 4.9 mm mrad vertical 5.7 mm mrad Momentum acceptance ± 2.5×10-3 NuPECC, FZ Jülich, 15/3/13
Barrier Bucket Cavity in COSY NuPECC, FZ Jülich, 15/3/13
HESR Prototyping and Tests at COSY Pellet Target WASA Residual Gas Profile Monitor Barrier Bucket Cavity Stochastic Cooling 2 MeVe-Cooler NuPECC, FZ Jülich, 15/3/13
FAIR Experiments CBM APPA Super-FRS PANDA NuSTAR NuPECC, FZ Jülich, 15/3/13
GSI FRS FAIR Super-FRS Super-FRS FRS 1000 7500 NuPECC, FZ Jülich, 15/3/13
Experiment NuSTAR Radiation Resistant Magnets • Normal conducting magnets using mineral insulated cable • 3 dipole, 3 quadrupole, and 2 sextupole magnets • Prototype dipole built and tested by BINP • Prototype dipole delivered and assembled at GSI Dipoles Quadrupoles Target area Sextupoles NuPECC, FZ Jülich, 15/3/13
Super-FRS SuperferricDipoles • 24 dipoles required • Iron dominated, warm iron • SC coil • Large aperture • ±19cm x ±7cm • 50 tons • Prototype built and tested by China and delivered to GSI IPP, Hefei NuPECC, FZ Jülich, 15/3/13
Timeline MSV 2011 2012 2013 2014 2015 2016 2017 2018 2019 12 9 11 6 7 8 10 Submission building permits Site preparation Civil construction contracts Building of accelerator & detector components Completion of basic civil construction work Installation & commissioning of accelerators and detectors Data taking 10 6 7 12 8 9 NuPECC, FZ Jülich, 15/3/13 11
Thank you very much NuPECC, FZ Jülich, 15/3/13