Work Progress Yassine LASSOUED y.lassoued@ucc.ie

Work Progress Yassine LASSOUED y.lassoued@ucc.ie. Layout. Work Packages Update on WP0 Update on WP1 Difficulties Deliverable D1.1 Future Plan. Layout Work Packages WP0 WP1 Difficulties D1.1 Future plan. Work Packages. WP1: Initiate & Identify

mindy
Download Presentation

Work Progress Yassine LASSOUED y.lassoued@ucc.ie

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Progress Yassine LASSOUED y.lassoued@ucc.ie GeoDI Progress Meeting 1

  2. Layout • Work Packages • Update on WP0 • Update on WP1 • Difficulties • Deliverable D1.1 • Future Plan • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  3. Work Packages WP1: Initiate & Identify T1.1 Review data and applications T1.2 User needs and prioritised data T1.3 Metadata and quality issues T1.4 Data familiarisation and review T1.5 Technical issues WP2: Review T2.1 Review ontologies and CVs T2.2 Identification of standards and models T2.3 Review ontology languages & tools T2.4 Review international best practice T2.5 Review state of the art ontology matching WP0 Project Management T0.1 Co-ordination of technical implementation of the project T0.2 Administration and financial management T0.3 Communication and dissemination strategy WP6: Synthesise T6.1 Assess analyses and services T6.2 Tools for geospatial analysis WP3: Specify Models T3.1 Specify integrated data models T3.2 Specify ontologies T3.3 Ontologies and models validation T3.4 Prototype & benchmarking T3.5 Ontology matching techniques WP5: Implement & Evaluate T5.1 Implement ontology server T5.2 Implement ET tools T5.3 Prototype integration & evaluation WP4: Specify System T4.1 Data delivery methods T4.2 Process changes for improved management T4.3 system specification • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  4. Update on WP0 • GeoDI Web site: http://geodi.ucc.ie • Liaising with EELA-2 (E-Science Grid for Europe and Latin America) • Grid tutorial and workshop (TCD) • Grid School (Rio de Janeiro)  Objective: Investigate the use of Grid technology for a better management of large volumes of geoscientific datasets • Liaising with Griffith • Pre-Kick off in July • Kick off meeting in October • Reporting: monthly, interim • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  5. Update on WP0 • ICAN workshop in July 2008: • Opportunity to meet US partners • Liaising with experts in oceanographic and geoscientific data management: • Franz Daffner (European Environment Agency) • Mike Osborne (Seazone Solutions, Ltd.) • Roy Lowry (British Oceanographic data centre)  Advice  Potential licensing of the GeoDI data model • Now, trying to liaise with CGI • Commission for the Management and Application of Geoscience Information • Supporting marine data in GeoSciML? • Contribute to GeoSciML? • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  6. Update on WP1 • Sample data obtained from MI • Thanks Dee & Eoin • Familiarisation with data • ArcGIS • Support from CMRC and MI • Thanks Max, Dee, Eoin, and Thomas • Data Familiarisation and User Needs Workshop • MI, 22 July 2008 • CMRC, Dee, Thomas • Users from MI • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  7. Update on WP1 • Tasks T1.1 – T1.5: Done • Deliverable D1.1: Review of Geoscientific Datasets • Final draft being reviewed before submission • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  8. Difficulties • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  9. Difficulties • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  10. Difficulties • Delays: 2 – 3 months • Contingency plan: • Start WP2 in time • OSU started working on T2.1 and T2.2 (Review of ontologies and data models) • Bring implementation tasks forward • Data modelling using Arc Marine will start shortly  Detecting potential problems at an early stage • Results from previous and ongoing projects will be used • InterRisk: Review of ontology languages and tools • IMAGIN: Data model • USGS data models • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  11. Deliverable D1.1 • Title: Review of Geoscientific Datasets • Due Date: 30 September 2008 • Size: 38 pages • Objective: • Identify and describe a prioritised list of geoscientific datasets, • Explain the structure and semantics of the prioritised datasets, • Identify technical problems with the current structure of the datasets, • Identify data issues such as quality, resolution or metadata, • Describe how the data and metadata are stored and managed. • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  12. Deliverable D1.1 • Structure: • Executive Summary • Introduction • Inventory of Geological and Geophysical Datasets • Data and Metadata Management • Data and Technical Issues • User Needs and Prioritised Datasets • Conclusion • Glossary • References • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  13. Deliverable D1.1 • Structure: • Executive Summary • Introduction • Inventory of Geological and Geophysical Datasets • Remotely-Sensed Datasets • Ground-Truthing Datasets • Other Background and Supplementary Datasets • Administrative Datasets and Metadata • Data and Metadata Management • Data and Technical Issues • User Needs and Prioritised Datasets • Conclusion • Glossary • References • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  14. Deliverable D1.1 • Structure: • Executive Summary • Introduction • Inventory of Geological and Geophysical Datasets • Data and Metadata Management • Archive Data • The Geo database • Other Data • Metadata (Granular & aggregated) • Data and Technical Issues • User Needs and Prioritised Datasets • Conclusion • Glossary • References • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  15. Deliverable D1.1 • Contribution from CMRC (Max), OSU, MI, GSI (Koen) • As suggested by Koen, we will add a chapter entitled “Context” • INFOMAR, INSS, MESH, IMAGIN • Role of MI and GSI • Griffith • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1

  16. Future Plan • WP2 • Review state of the art ontologies and data models • Review ontology languages and tools • Recruitment of ontology matching researcher at 4C • Job specs • WP3 • Implement an initial data model using Arc Marine • Study GeoSciML • Integration of GeoSciML and Arc Marine? • Layout • Work Packages • WP0 • WP1 • Difficulties • D1.1 • Future plan GeoDI Progress Meeting 1