An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Progress Yassine LASSOUED y.lassoued@ucc.ie GeoDI Progress Meeting 3

  2. Layout • Work Packages • Status Update • Difficulties • Deliverables • Data Model • Implementation • Future Plan • Layout • Work Packages • Status Update • Difficulties • Deliverables • Data Model • Implementation • Future plan GeoDI Progress Meeting 3

  3. Work Packages WP1: Initiate & Identify T1.1 Review data and applications T1.2 User needs and prioritised data T1.3 Metadata and quality issues T1.4 Data familiarisation and review T1.5 Technical issues WP2: Review T2.1 Review ontologies and CVs T2.2 Identification of standards and models T2.3 Review ontology languages & tools T2.4 Review international best practice T2.5 Review state of the art ontology matching WP0 Project Management T0.1 Co-ordination of technical implementation of the project T0.2 Administration and financial management T0.3 Communication and dissemination strategy WP6: Synthesise T6.1 Assess analyses and services T6.2 Tools for geospatial analysis WP3: Specify Models T3.1 Specify integrated data models T3.2 Specify ontologies T3.3 Ontologies and models validation T3.4 Prototype & benchmarking T3.5 Ontology matching techniques WP5: Implement & Evaluate T5.1 Implement ontology server T5.2 Implement ET tools T5.3 Prototype integration & evaluation WP4: Specify System T4.1 Data delivery methods T4.2 Process changes for improved management T4.3 system specification GeoDI Progress Meeting 3

  4. Status Update • WP0 • GeoDI Web site: http://geodi.ucc.ie • Reporting: monthly, interim • Liaising with Griffith • Griffith Steering Meeting (02 July 2009) • Internal meetings • Liaising with JuDJuT • 2 internal meetings at CMRC • Recruited 4C postdoctoral researcher for the Ontology Matching position • Generated a book chapter from GeoDI and Griffith deliverables • Chapter: Atlas Interoperability • Book: ICAN Handbook GeoDI Progress Meeting 3

  5. Status Update • WP1 • Finalised D1.1 (Review of Geoscientific Datasets) GeoDI Progress Meeting 3

  6. Status Update • WP2 • Tasks T2.1 – T2.3: Completed • Deliverable D2.1: Review of Ontologies and Controlled Vocabularies • Reviewed by MI, but needs to be finalised • Deliverable D2.2: Identification of Standards and Data Models • Reviewed by MI, but needs to be finalised • Deliverable D2.3: Review on Ontology Languages and Tools • Reviewed by MI, but needs to be finalised • Task T2.4: In progress (80% completed) • Deliverable D2.4: Review of International Best Practice… • Internal review before submission to MI GeoDI Progress Meeting 3

  7. Status Update • WP3 • T3.1 (Integrated Data Models) • Initial data model sent for review by OSU & USGS • Data model based on Arc Marine • T3.4 (Prototype Implementation and Benchmarking) • Installed and tested PostgreSQL/PostGIS • Wrote SQL script for installing Arc Marine (PostgreSQL)  To be published on the Arc Marine web site • Installed Arc Marine on PostGIS GeoDI Progress Meeting 3

  8. Difficulties • Data Modelling • Data complexity (relationships) • Data heterogeneity  Need to design a model that supports all the types of information available in the existing datasets • “Many” options for modelling  Selected option that “makes the most sense” • Domain knowledge  Support from CMRC experts (Max Kozachenko & Gerry Sutton) GeoDI Progress Meeting 3

  9. Deliverables • D1.1: Review of Geoscientific Datasets • Finalised and submitted to MI GeoDI Progress Meeting 3

  10. Deliverables • D2.1: Review of Ontologies and CVs • Content: • Introduction • Introduction to CVs and Ontologies • Existing CVs and Ontologies • GSI, BGS, USGS, NASA, SeaDataNet, etc. • Ontology Use Cases • Interoperability, ETL, Semantic Frameworks • Projects: ICAN, GCMD, OTEG, InterRisk, etc. • Size: 50 pages • Status: • Reviewed by MI (WebEx call) • No major edits required GeoDI Progress Meeting 3

  11. Deliverables • D2.2: Identification of Standards and Data Models • Content: • Introduction • Standards • Organisations: W3C, ISO, OGS, CEN, INSPIRE • Standards: Metadata, Data, Ontologies, Information Exchange • Recommendations • Data Models • Arc Marine, GeoSciML, Arc Geology • Initial Recommendation on Data Model for GeoDI • Size: 30 pages • Status: • Reviewed by MI (WebEx call) • No major edits required GeoDI Progress Meeting 3

  12. Deliverables • D2.3: Review of Ontology Languages and Tools • Content: • Introduction • Introduction to Ontologies • Definition, Semantic Web, Uses of Ontologies • Ontology Languages and Query Languages • RDF, RDF-S, SKOS, OWL, SPARQL, Recommendations • Ontology Tools • Editing, Servers, APIs, Other Tools • Size: 32 pages • Status: • Reviewed by MI (WebEx call) • Need to elaborate more • Need examples from the geoscientific domain GeoDI Progress Meeting 3

  13. Deliverables • D2.4: International Best Practice • Content: • Introduction • Important Developments in the Management of Large Marine Geoscientific Datasets • Bathymetric Attribute Grid, OGC TCWG • Example Projects Showcasing International Best Practice • SIOExplorer, Marine Geoscience Data System • Size: Currently 22 pages • Status: • Under review by CMRC • To add: Chapter on Grid Technology (CMRC) GeoDI Progress Meeting 3

  14. Data Model • Based on Arc Marine • Six packages: • Business Information • Geo Points • Samples • Geo Lines • Measurements • Raster GeoDI Progress Meeting 3

  15. Data Model Arc Marine GeoDI GeoDI Progress Meeting 3

  16. Implementation • Current: • Database implementation on PostgreSQL • Arc Marine implemented • To do: implement the GeoDI model • Load data into the geodatabase • Testing and benchmarking • Future: • Ontology-based automatic or semi- ETL (4C) • Options: • Prototype for a Geo Grid Library (Geo-GLibrary) • Prototype for an ontology based data discovery and delivery system GeoDI Progress Meeting 3

  17. Planning for Next 6 Months • WP2 • Finalise D2.3 & D2.4 • WP3 • Implement data model • Meeting with MI users? • Feed the geodatabase • Validate data model • Start work on automatic ETL tools (4C) • Develop ontologies • Integration of GeoSciML and Arc Marine? GeoDI Progress Meeting 3

  18. Planning for Next 6 Months GeoDI Progress Meeting 3