Work Progress Yassine LASSOUED y.lassoued@ucc.ie. Layout. Work Packages Status Update Difficulties Deliverables Data Model Implementation Future Plan. Layout Work Packages Status Update Difficulties Deliverables Data Model Implementation Future plan. Work Packages.
E N D
Work Progress Yassine LASSOUED y.lassoued@ucc.ie GeoDI Progress Meeting 3
Layout • Work Packages • Status Update • Difficulties • Deliverables • Data Model • Implementation • Future Plan • Layout • Work Packages • Status Update • Difficulties • Deliverables • Data Model • Implementation • Future plan GeoDI Progress Meeting 3
Work Packages WP1: Initiate & Identify T1.1 Review data and applications T1.2 User needs and prioritised data T1.3 Metadata and quality issues T1.4 Data familiarisation and review T1.5 Technical issues WP2: Review T2.1 Review ontologies and CVs T2.2 Identification of standards and models T2.3 Review ontology languages & tools T2.4 Review international best practice T2.5 Review state of the art ontology matching WP0 Project Management T0.1 Co-ordination of technical implementation of the project T0.2 Administration and financial management T0.3 Communication and dissemination strategy WP6: Synthesise T6.1 Assess analyses and services T6.2 Tools for geospatial analysis WP3: Specify Models T3.1 Specify integrated data models T3.2 Specify ontologies T3.3 Ontologies and models validation T3.4 Prototype & benchmarking T3.5 Ontology matching techniques WP5: Implement & Evaluate T5.1 Implement ontology server T5.2 Implement ET tools T5.3 Prototype integration & evaluation WP4: Specify System T4.1 Data delivery methods T4.2 Process changes for improved management T4.3 system specification GeoDI Progress Meeting 3
Status Update • WP0 • GeoDI Web site: http://geodi.ucc.ie • Reporting: monthly, interim • Liaising with Griffith • Griffith Steering Meeting (02 July 2009) • Internal meetings • Liaising with JuDJuT • 2 internal meetings at CMRC • Recruited 4C postdoctoral researcher for the Ontology Matching position • Generated a book chapter from GeoDI and Griffith deliverables • Chapter: Atlas Interoperability • Book: ICAN Handbook GeoDI Progress Meeting 3
Status Update • WP1 • Finalised D1.1 (Review of Geoscientific Datasets) GeoDI Progress Meeting 3
Status Update • WP2 • Tasks T2.1 – T2.3: Completed • Deliverable D2.1: Review of Ontologies and Controlled Vocabularies • Reviewed by MI, but needs to be finalised • Deliverable D2.2: Identification of Standards and Data Models • Reviewed by MI, but needs to be finalised • Deliverable D2.3: Review on Ontology Languages and Tools • Reviewed by MI, but needs to be finalised • Task T2.4: In progress (80% completed) • Deliverable D2.4: Review of International Best Practice… • Internal review before submission to MI GeoDI Progress Meeting 3
Status Update • WP3 • T3.1 (Integrated Data Models) • Initial data model sent for review by OSU & USGS • Data model based on Arc Marine • T3.4 (Prototype Implementation and Benchmarking) • Installed and tested PostgreSQL/PostGIS • Wrote SQL script for installing Arc Marine (PostgreSQL) To be published on the Arc Marine web site • Installed Arc Marine on PostGIS GeoDI Progress Meeting 3
Difficulties • Data Modelling • Data complexity (relationships) • Data heterogeneity Need to design a model that supports all the types of information available in the existing datasets • “Many” options for modelling Selected option that “makes the most sense” • Domain knowledge Support from CMRC experts (Max Kozachenko & Gerry Sutton) GeoDI Progress Meeting 3
Deliverables • D1.1: Review of Geoscientific Datasets • Finalised and submitted to MI GeoDI Progress Meeting 3
Deliverables • D2.1: Review of Ontologies and CVs • Content: • Introduction • Introduction to CVs and Ontologies • Existing CVs and Ontologies • GSI, BGS, USGS, NASA, SeaDataNet, etc. • Ontology Use Cases • Interoperability, ETL, Semantic Frameworks • Projects: ICAN, GCMD, OTEG, InterRisk, etc. • Size: 50 pages • Status: • Reviewed by MI (WebEx call) • No major edits required GeoDI Progress Meeting 3
Deliverables • D2.2: Identification of Standards and Data Models • Content: • Introduction • Standards • Organisations: W3C, ISO, OGS, CEN, INSPIRE • Standards: Metadata, Data, Ontologies, Information Exchange • Recommendations • Data Models • Arc Marine, GeoSciML, Arc Geology • Initial Recommendation on Data Model for GeoDI • Size: 30 pages • Status: • Reviewed by MI (WebEx call) • No major edits required GeoDI Progress Meeting 3
Deliverables • D2.3: Review of Ontology Languages and Tools • Content: • Introduction • Introduction to Ontologies • Definition, Semantic Web, Uses of Ontologies • Ontology Languages and Query Languages • RDF, RDF-S, SKOS, OWL, SPARQL, Recommendations • Ontology Tools • Editing, Servers, APIs, Other Tools • Size: 32 pages • Status: • Reviewed by MI (WebEx call) • Need to elaborate more • Need examples from the geoscientific domain GeoDI Progress Meeting 3
Deliverables • D2.4: International Best Practice • Content: • Introduction • Important Developments in the Management of Large Marine Geoscientific Datasets • Bathymetric Attribute Grid, OGC TCWG • Example Projects Showcasing International Best Practice • SIOExplorer, Marine Geoscience Data System • Size: Currently 22 pages • Status: • Under review by CMRC • To add: Chapter on Grid Technology (CMRC) GeoDI Progress Meeting 3
Data Model • Based on Arc Marine • Six packages: • Business Information • Geo Points • Samples • Geo Lines • Measurements • Raster GeoDI Progress Meeting 3
Data Model Arc Marine GeoDI GeoDI Progress Meeting 3
Implementation • Current: • Database implementation on PostgreSQL • Arc Marine implemented • To do: implement the GeoDI model • Load data into the geodatabase • Testing and benchmarking • Future: • Ontology-based automatic or semi- ETL (4C) • Options: • Prototype for a Geo Grid Library (Geo-GLibrary) • Prototype for an ontology based data discovery and delivery system GeoDI Progress Meeting 3
Planning for Next 6 Months • WP2 • Finalise D2.3 & D2.4 • WP3 • Implement data model • Meeting with MI users? • Feed the geodatabase • Validate data model • Start work on automatic ETL tools (4C) • Develop ontologies • Integration of GeoSciML and Arc Marine? GeoDI Progress Meeting 3
Planning for Next 6 Months GeoDI Progress Meeting 3