120 likes | 242 Views
Permit Programs. Laura McKelvey, EPA/OAQPS Dan Blair, Gila River Indian Community. Permits To Construct. Ensures that construction or modification of any stationary source will not cause or contribute to ambient air quality (AQ) problems. Three Permit-to-Construct Programs.
E N D
Permit Programs Laura McKelvey, EPA/OAQPS Dan Blair, Gila River Indian Community
Permits To Construct Ensures that construction or modification of any stationary source will not cause or contribute to ambient air quality (AQ) problems
Three Permit-to-Construct Programs • New minor sources & minor modifications to existing sources • New major sources & major modifications in attainment or unclassifiable areas • New major sources and major modifications in nonattainment areas
Minor New Source Review (NSR) • Custom designed to address needs of permitting authority’s jurisdiction • Based on sources types, AQ, expected emissions growth, other • Ensures control over new emissions, prevents violations of standards & unacceptable AQ degradation
Prevention of Significant Deterioration (PSD) • New major stationary sources, major modifications to existing major sources • For attainment, unclassifiable areas • Best Available Control Technology (BACT) • Protects ambient standards, prevents significant AQ deterioration • Protects AQ-related values of Class I areas
Part D (NAA)—New Source Review (NSR) • New major stationary sources, major modifications to existing major sources • Applies in NAAs • Lowest Achievable Emission Rate (LAER) • Emission offsets • Alternative analysis
Other Permitting Programs • Open-burning permits • Backyard burning • Land-clearing debris • Demolition debris • Agricultural-burning permits • Grass seed field burning • Wheat stubble
Other Permitting Programs (cont.) • Forestry burning permits • Slash burning • Prescribed fires • Woodstove permits
GRIC Permitting (Proposed) • Major-source permitting (proposed) • NSR permitting (EPA) • PSD permitting (EPA) • Operating permits (GRIC) • Synthetic minor permitting (GRIC) • HAPs source permitting
GRIC Permitting (Proposed) • Minor source/area source permitting • Minor source permits • TSDs • Ordinances/rules • Area source permits • Open burning • Agricultural operations • Earth-moving/dust control permits
GRIC Permitting • GRIC is permitting the HMIWI • HMIWI must comply with time lines and requirements in MWO • A complete Permit Application w/supporting documents must be to GRIC by 6/10/2002
GRIC Permitting • Permit will contain • Owner/operator info. • All operating requirements • Material handling requirements • Transportation requirements • Emissions limits • Operating parameters established during stack test