FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC FY07/08 DOE Budget Briefing
Outline • Status of FY06 • Opportunities for FY07 • FY07 Budget Discussion • Scenarios for FY07 • FY08 Budget Discussion • Scenarios for FY08 FY07/08 DOE Budget Briefing
Status of FY06 • FY06 • Funding--HEP $145.8M • Funding—BES 29.4M • TOTAL $175.2M • Impact/Opportunities of FY06 budget • Full funding to B-factory operations • B-factory AIP reduced $0.5M • Strong ILC Program funded at $12.3M • Some investment in future opportunities • EXO 200 • Accelerator R&D • LSST R&D FY07/08 DOE Budget Briefing
Status of FY06 (cont.) • Program Elements • B-factory • Technical problem currently limiting luminosity • Subject of weekly discussions with program office • Impact at ~5% level on long-term luminosity goals • 40 running weeks • Integrated luminosity projected for FY06: 91/fb • IFR upgrade starts summer 06 • Machine upgrades summer 06 • GLAST • DOE project complete • Build-up of ISOC • Instrument operations support capped at $5M/yr • Getting ready for science FY07/08 DOE Budget Briefing
Status of FY06 (cont.) • ILC R&D • SLAC R&D focus—GDE supported • e+e- sources • Beam Delivery system • Rf power sources • Availability and operation • Instrumentation • Operations support for L-band klystron development • Leadership positions in many subsystems • Small increase in detector R&D • Continued test beam experiments • E166 e+ polarization run completed • ATLAS: SLAC has applied to join ATLAS and will submit proposal to become a Tier 2 site for ATLAS FY07/08 DOE Budget Briefing
Status of FY06 (cont.) • Advanced Accelerator R&D • Plasma wake field acceleration • E164/E164X/E167 • Optimize program for final FFTB runs • Spectacular results, very successful • Laser acceleration experiment progressing in ESB • Some slow down due to funding shortfall • SABER white paper developed • Workshop March 15/16 • Working on operating costs and schedule • Possibility of SABER commissioning in FY08 FY07/08 DOE Budget Briefing
Status of FY06 (cont.) • New Initiatives • EXO • EXO200 under construction • All resources focused on getting to WIPP 12/06 • Barium tagging R&D on hold • LSST • Redirected some of resources from GLAST roll off • Build up of collaboration • Resources focused on upcoming competition/ P5 process • Director’s review of cost and schedule this week • SNAP • Growing into major role in electronics • Natural evolution of expertise developed on GLAST • Small investment from base, growth to come through LBNL FY07/08 DOE Budget Briefing
FY07 Budget Discussion • Changes from FY06 to FY07 (Summary) • FY06 Funding: $175.2M • Program Changes 06->07 11.1M (see slide 9) • FY07 Funding Needed: $186.3M • FY07 President’s Budget $186.3M • 2007 is a year of opportunity! • With careful management and close coordination with the national priority setting process, SLAC can help grow programs central to the future of the field. FY07/08 DOE Budget Briefing
Program Changes FY06 to FY07 FY07/08 DOE Budget Briefing
Additional Resources Available in FY07 • We will continue to manage the staff size down through attrition and targeted programmatic layoffs • In all scenarios anticipate an addition ~$1M will be liberated in this fashion • We will continue to manage the transfer of staff from GLAST and B-factory programs to LCLS, ILC and new initiatives • Klystron department manpower • Electronics engineering • Mechanical engineering FY07/08 DOE Budget Briefing
Additional FY07 Priority Program Opportunities • LSST • We will compete for additional funds to develop ground based dark energy telescope • ILC • We will compete for additional funds to develop the RF sources for the ILC • LCD • We will compete for additional funds to grow the Linear Collider Detector effort FY07/08 DOE Budget Briefing
FY07 President’s Budget + 5% FY07 Scenario A $195.3M • B-Factory • 40 weeks • $4M AIP • Int L (Run 6)= 180/fb • ILC • $21M ILC program focused on GDE priorities • Assumes successfully compete for additional $6M • Increase LCD by $1M after successful competition for additional resources • GLAST • Instrument operations preparation, support for I&T, preparation for science • EXO 200 operating • Invest in Barium tagging R&D for big EXO • Accelerator R&D • Start construction of SABER • Support HG program from base resources • LSST • Increase by $2.1M assuming successful competition for dark energy resources and encouragement from P5 • ATLAS • Development of Tier 2 assuming successful proposal FY07/08 DOE Budget Briefing
FY07 President’s Budget + 5% FY07 Scenario A $ 195.3M • Opportunities • B-factory program focused on maximum luminosity before end of FY08 • ILC—focused on RF source development taking advantage of unique SLAC resources (klystron dept) • EXO—R&D for ultimate double beta decay expt. • Go forward with LSST • Go forward with SABER • Healthy running program and growth of new opportunities for field • Well aligned with HEP roadmap from P5 FY07/08 DOE Budget Briefing
FY07 President’s Budget FY07 Scenario B $186M • B-Factory • 40 weeks • $4M AIP • Int L (Run 6)= 180/fb • ILC • $14.8M program focused on GDE priorities • Assumes unsuccessfully compete for additional resources • May lose opportunity to contribute to ILC power source • GLAST • Instrument operations preparation, support for I&T, preparation for science • EXO 200 operating • Invest in Barium tagging R&D for big EXO • Accelerator R&D • Start construction of SABER • Support HG program from base resources • LSST • Assume unsuccessful competition for dark energy resources • Investment from base program depends on P5 recommendation • Would be balanced with investment in EXO R&D • ATLAS • Development of Tier 2 assuming successful proposal FY07/08 DOE Budget Briefing
FY07 President’s Budget FY07 Scenario B $186M • Opportunities • B-factory program focused on maximum luminosity before end of FY08 • ILC—target modulator development. Cannot engage in klystron development • No increase in LCD R&D above small FY06 base level, risking US leadership on detector development • Will be guided by P5 recommendations in determining investments in EXO—R&D vs LSST • Go forward with SABER • Healthy running program and limited growth of new opportunities for field • Will bring headcount down by additional ~15 to allow for new opportunities FY07/08 DOE Budget Briefing
FY07 President’s Budget – 5% FY07 Scenario C $176.7M • B-Factory • 40 weeks • $4M AIP • Int L (Run 6)= 153/fb • ILC • $12.8M program flat from FY06 • Lose opportunities to contribute to power source, Cannot grow modulator program • Minimal investment in LCD • GLAST • Instrument operations preparation, support for I&T, preparation for science. Lay off all staff coming off instrument integration support • EXO 200 operating • R&D unfunded • Accelerator R&D • SABER unfunded • HG program unfunded • LSST • Flat or down depending on P5 • Staff measures • RIF approximately 60 people, impact B-factory performance FY07/08 DOE Budget Briefing
FY07 President’s Budget – 5% FY07 Scenario C $176.7M • IMPACTS(Relative to Scenario B) • B-factory integrated luminosity hurt by loss of people due to layoffs • Compromise SLAC role in ILC • Reduction in staff cripples ability to foster new program initiatives for the field. • No new initiatives supported • What HEP physics will we be doing in 2012? FY07/08 DOE Budget Briefing
FY08 Budget Discussion • Scenarios for FY08 depend on budget in FY07 • Talent lost in FY07 cannot be recaptured in FY08 • Will assume Scenario A(+5%) in FY07 for Scenario D(+10%) in FY08 • Will assume Scenario B(PB) in FY07 for Scenario E(PB)&F(-5%) in FY08 FY07/08 DOE Budget Briefing
Changes FY07 to FY08 FY07/08 DOE Budget Briefing
FY08 Scenario D $204.6M Scenario A + 5% • B-Factory • 44 weeks • $3.5M AIP • Int L (Run 7)= 366/fb • ILC • $24M ILC program focused on GDE priorities (Increase $2M over FY07) • LCD held flat at FY07 level • GLAST • On orbit operations and beginning of science • EXO 200 operating • Continued investment in Barium tagging R&D • Accelerator R&D • Complete SABER Phase I (no bypass) • Support HG program from base resources • LSST • Flat assuming encouragement from P5 • SNAP • Flat or increase with LBNL support • ATLAS • Continued development of Tier 2 FY07/08 DOE Budget Briefing
FY08 Scenario D $204.6M Scenario A + 5% • Opportunities • Final year of B-factory program focused on maximum luminosity before end of run • ILC—continued growth in focused areas • EXO—R&D for ultimate double beta decay expt. • Continued LSST pre-engineering • Completion of SABER Phase I (no bypass) and possible operations of plasma program • Healthy running program and growth of new opportunities for field • Well aligned with HEP roadmap from P5 FY07/08 DOE Budget Briefing
FY08 = FY07 President’s Budget FY08 Scenario E $186M • B-Factory • 44 weeks • $3.5M AIP • Int L (Run 7)=366/fb • ILC • $14.8M program flat from FY07. • No LCD growth (continued flat from FY06) • GLAST • On orbit operations and beginning of science • EXO 200 operating • Accelerator R&D • Unable to complete SABER Phase I (no bypass) • No support for HG program • LSST & Big EXO R&D • FY06 levels or down depending on P5 recommendations • Staff Measures • Approximately 35 layoffs FY07/08 DOE Budget Briefing
FY08 = FY07 President’s Budget FY08 Scenario E $186M • Opportunities (Relative to scenario B) • Final year of B-factory program focused on maximum luminosity before end of run • ILC—no growth, SLAC not in leadership role • Operations for EXO 200 • Very limited resources for LSST camera construction and/or Big EXO R&D • Completion of SABER Phase I (no bypass) not possible • Limited possibilities to future program development or ILC contributions • Would narrow program (SABER, EXO, LSST, SNAP, ILC) to focus and make one or two successful FY07/08 DOE Budget Briefing
FY08 Scenario F $176.7M FY08 = FY07 President’s Budget – 5% • B-Factory • 44 weeks • $3.5M AIP • Int L (Run 7)=311/fb • ILC • $8.8M program (reduction of $6M vs FY07) • No LCD growth (continued flat from FY06) • GLAST • On orbit operations and beginning of science • EXO 200 operating • Accelerator R&D • Unable to complete SABER Phase I (no bypass) • No support for HG program • LSST & Big EXO R&D, Research Programs • Would need to eliminate several efforts to recover $3.5M in resources • Staff Measures • Approximately 120 layoffs – or limit B-factory running in FY08 • Impact on B-factory performance • Impact on research productivity of lab FY07/08 DOE Budget Briefing
FY08 Scenario F $176.7M FY08 = FY07 President’s Budget – 5% • IMPACTS (relative to scenario B) • B-factory program reduced • Diminished efficiency due to layoffs of technical staff • ILC • SLAC minor role in ILC development, jeopardizing international ILC program • GLAST • Cut in operations threatens science productivity of the mission • EXO and new initiatives not supported • No support to Advanced Accelerator Program • No FFTB replacement • Approximately 120 additional staff layoffs needed; • Impacts efficiency of B-factory operations FY07/08 DOE Budget Briefing
Conclusions • SLAC program offers tremendous physics opportunities to national HEP community • Program is tight and aggressively managed • FY07 budget and future Office of Science growth offers significant opportunities for SLAC to serve the national program • Investments will be aligned with national roadmap for the field FY07/08 DOE Budget Briefing