230 likes | 556 Views
GIG 2.0/JIE in PACOM.
E N D
1. Implementing the GIG 2.0 Vision and Strategy in the Pacific
2. GIG 2.0/JIE in PACOM “I share VADM Brown's vision of the Global Information Grid 2.0 -- we must evolve our IT services into a Single Information Environment with common standards and centralized governance in order to provide an information advantage to warfighters. Ongoing IT planning efforts in Guam/Marianas and Korea serve as the Joint Information Environment templates for the entire theater. I recognize and applaud the energy and hard work already applied to this groundbreaking effort.”
8. Today’s Environment We are still stove-piped – organize vertically, fight horizontally
9. Impact on the Warfighter
10. GIG 2.0 Characteristics
11. JIE - Marianas – The Basics Joint/Multi-Service Effort – started April 2008
Guam JIE-M Steering Council (GJSC)
DoN CIO, NNWC and PACOM J6 Tri-Chair
Navy Assigned EA – role still evolving
JIE-M Architecture Team Chartered – August 2008
$600K Phase 1A – delivers this week
$500K (so far) Phase 1B (ASD/NII funding) – executes through 1Q FY’10
Employs discipline of JCIDS and DoDAF
Primary target: POM ’12
Near-term target: IT “foundational” investments (FY’10/’11)
Methods:
Align with GIG 2.0 Architecture/CONOPs/ICD
Transparent IM/KM Space: https://www.intelink.gov/wiki/GIG_2.0_Marianas
13. JIE-M Architecture Drivers CONPLANs/OPLANs – derive IT requirements from warfighter needs
C/S/A CONOPs/TTPs – add detail
Mission Modeling – build the “story”
GIG 2.0 – drive joint/interoperable/efficient solutions
JCA>FCB>PoR) – align programmatically
PACOM J6 Information Services Reference Model (ISRM) – adopt consistent capabilities/services taxonomy
Stakeholder Engagement – “deckplate” credibility
MILCONs – recognize practical timelines
Force Build-Up – provide ground truth to the end-point device/service
Synch with Guam/Marianas Infrastructure Build-Out – create opportunities to build-in IT
15. Aligning to GIG 2.0
22. BACK UP SLIDES