An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. En-Route Working GroupReport Out 18 Dec 2013

  2. DCIT En-Route Documentation Production • Good progress on two packages • TOC/IC • Route modifications • Deliveries • Initial delivery: 28 Feb 2014 • Detailed and synched to the level of the FAA Use Cases • End-to-End documents (above two) • Too early for Flight Deck and SDD • Second delivery, detailed definitions • Detailed and synched to the level of FAA A-level specifications • Detailed messaging, route clearance generation, off-nominal cases, etc. • End-to-End documents, Flight Deck Guidance, SDD • 9/14: NSDA and Initial FAA Domestic En-route Services

  3. En-route Trials • Engineering trials, summer 2014, are useful • Eng Trials satisfy only a sub-set of the agreed DCIT objectives • Industry endorses the engineering trials, but would like to work with the Data Comm Program Office on further validation • Include extensibility in the trials (e.g. add TOC/IC for inter-center trials, both at the boundaries of NAS-domestic and inside NAS-domestic) • Further explore validation activities beyond engineering trials • Additional validation activities, defined in 1st half of 2014 • Early IOC Key Site activites • Observing FAA objectives on managing requirements creep • Observing FAA objectives on no jeopardizing operational ERAM deployment through trials systems deployment(s)

  4. Future work organization • Excellent progress on DCL end-to-end this last few meetings • With Operational DCL End-to-End getting to mature draft, need to re-establish WGs • Flight Deck to begin working FD Guidance Material from end-to-end • SIT to review Interface Requirements Document(s) and determine if SIDD needed • ATC and AOC working group needs TBD • Combined Working Group sessions to be added back, rather than combining this with the OMWG • We also are nearing the need for this in En-Route, so timing is just right • Allows OMWG to get back to more like the weekly telecons • Focused on operational trials management issues and direction • Participants focused on operational issues, not drafting and WG issues