1 / 10

802.15 Liaison Report

802.15 Liaison Report. Authors:. Date: 2010-05-20. Abstract. Liaison report on 802.15 as presented to 802.11. 802.15.4. Will start the rollup process imminently. Slide 3. Slide 3. Clint Chaplin, Samsung Electronics. 802.15.4e MAC amendments.

mspillman
Download Presentation

802.15 Liaison Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 802.15 Liaison Report Authors: Date: 2010-05-20 Clint Chaplin, Samsung Electronics

  2. Abstract Liaison report on 802.15 as presented to 802.11 Clint Chaplin, Samsung Electronics

  3. 802.15.4 Will start the rollup process imminently Slide 3 Slide 3 Clint Chaplin, Samsung Electronics

  4. 802.15.4eMAC amendments First WG ballot on D1.0 closed May 17, 2010. Results were 120/43/15. 73.62% Affirmative: Fails 1643 comments: 1152 Technical, 491 Editorial Working on resolving comments Slide 4 Slide 4 Clint Chaplin, Samsung Electronics

  5. 802.15.4fRFID Filled in many TBDs in the various documents under development Still much work to be done to merge into a single draft Slide 5 Slide 5 Clint Chaplin, Samsung Electronics

  6. 802.15.4gSmart Utility Networks First WG ballot on D1.0 closed May 12, 2010. Results were 128/45/12. 73.99% Affirmative: Fails 1816 comments: 1301 Technical, 515 Editorial Working on resolving comments Technical 345, 27% Editorial 35, 21% Total 380, 21% Slide 6 Slide 6 Clint Chaplin, Samsung Electronics

  7. 802.15.4hCorregendum First WG ballot on D1.0 closed May 13, 2010. Results were 160/7/18. 95.81% Affirmative: Passed! 111 comments: 65 Technical, 46 Editorial Working on resolving comments Slide 7 Slide 7 Clint Chaplin, Samsung Electronics

  8. 802.15.6 Wireless Body Area Networks Finished the baseline draft. Voted to go out for initial WG ballot: two months early! November 2009 Slide 8 Slide 8

  9. 802.15.7Visible Light Communication First WG ballot on D1.0 closed April 7, 2010. Results were 104/19/28. 84.55% Affirmative: Passed! 1403 comments: 916 Technical, 487 Editorial Working on resolving comments Editorial comments: 293(60%) comments are resolved Technical comments: 347(38%)comments are resolved Slide 9 Slide 9 Clint Chaplin, Samsung Electronics

  10. References This document All Documents https://mentor.ieee.org/802.15/documents Current draft is in the members-only area http://www.ieee802.org/15  Members_Only_Area 802.11 members log in using 802.11 username and password Slide 10 Clint Chaplin, Samsung Electronics

More Related