Multifunction Phased Array Radar

Multifunction Phased Array Radar. Radar Operations and Maintenance (O&M) Cost Data Collection and Analysis Update. PAR Work Group. Magda Batista-Carver. June 21, 2007. Radar O&M Cost Data Collection.

Download Presentation

Multifunction Phased Array Radar

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Multifunction Phased Array Radar Radar Operations and Maintenance (O&M) Cost Data Collection and Analysis Update PAR Work Group Magda Batista-Carver June 21, 2007

  2. Radar O&M Cost Data Collection • Being developed in response to MPAR Working Group Action Item # 2007-1.2, “Complete life cycle cost analysis for legacy radar systems”

  3. Purpose • Form key input for overall cost benefit analysis for MPAR Business Case • Systems to be included • 171 WSR-88Ds (NEXRAD) • 47 Terminal Doppler Weather Radars (TDWR) • 135 ASR-9s/Mode-S • 149 ASR-11s • 118 Long Range Radars (LRR) • ARSR-1 through 4 • FPS-20/60

  4. Methodology • Adopt standardize Work Breakdown Structure (WBS) to ensure consistency between FAA radar and NEXRAD costs • Collect and analyze historical data for baseline • Projected costs include • standard inflation • failure rate estimates of major components

  5. Work Breakdown Structure Template N/A: Requirements are not applicable

  6. WBS Element Examples

  7. Challenges • Inability to collect detailed cost information • Inability to breakout corrective and preventative maintenance costs • Inconsistent terminology • Collecting and integrating NEXRAD tri-agency cost information

  8. Status

  9. NEXRAD Team Composition • National Oceanic & Atmospheric Administration • Tim Crum • Marty Williams • Russ Cook • Department of Defense • Mike Spaulding • Office of Federal Coordinator for Meteorology • Mark P. Weadon • Federal Aviation Administration • Magda Batista-Carver

  10. NEXRAD Unique Cost Factors • Archival costs • NEXRAD Radar Operations Center (ROC) • Product Improvement Categories • Performance Enhancement (e.g., Dual Polarization, Radar Product Generator Refresh, etc.) • Obsolescence • Reliability (e.g. Open Radar Data Acquisition (ORDA), trigger amplifier, etc.)

  11. Next Steps • O&M Cost Working Group • Continue to collect and analyze cost data • Complete final report by October 2007 • PAR Working Group • Use O&M Cost final report as a key input to a PAR Business Case