1 / 8

Managementul proiectelor software

Universitatea “ Politehnica ” Bucuresti Facultatea de Automatica si Calculatoare Catedra Calculatoare lector dr. ing . Costin-Anton Boiangiu Costin.Boiangiu@cs.pub.ro. Managementul proiectelor software . Studiu de caz : Lucrare de doctorat.

munin
Download Presentation

Managementul proiectelor software

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Universitatea “Politehnica” Bucuresti Facultatea de AutomaticasiCalculatoare CatedraCalculatoare lector dr. ing. Costin-Anton Boiangiu Costin.Boiangiu@cs.pub.ro Managementul proiectelorsoftware

  2. Studiu de caz: Lucrare de doctorat “Sistem expert pentruprognozaactiunilorbursiere”

  3. Studiu de caz: Lucrare de doctorat • Interval de estimare: 10 secunde • Evaluareproces stochastic: Lanturi Markov • 70% predictiecorecta. E suficient? • Evaluarecomision • 99% stiinta, 1% rutina • Omul de stiinta nu esteneaparatinclinatpractic • Un bun manager asigura un produscompletsiviabil

  4. Studiu de caz: Microsoft (Redmond)

  5. Studiu de caz: Microsoft (Redmond) • GM • alegeproiectul • ildescrieintr-o intalnirecelor 3 lead. • se ocupa de impartireabanilor, gasirea de noiresurse, rezolvarea de problemedeosebit de importante (care trec de lead) • PM-lead • imparteproiectul in sub-arii • scriespecificatiile high-level • supervizeaza pm-ii • se sincronizeaza cu  dev-lead si test-lead • Dev-lead • supervizeaza dev-ii • se sincronizeza cu pm lead si test lead • scrie cod la nevoie • face code review • Test-lead • supervizeazatesterii • se sincronizeaza cu dev lead si pm lead • face code review la testeri

  6. Studiu de caz: Microsoft (Redmond) • PM • scriespecificatiile mid-level • imparte aria in “work item”-uri • face research • adunaresursele de care au nevoie DEV si TEST • se sincronizeaza cu ceilalti PM • DEV • implementeazaspecificatiile • se sincronizeaza cu alti DEV-i • TEST • scrie test planul • ilimplementeaza • se sincronizeaza cu ceilalti TEST • face code review DEV-ului

  7. Studiu de caz: Microsoft (Redmond) • Avantaje / Dezavantaje?

  8. Intrebari? Va multumesc !

More Related