660 likes | 820 Views
Project Comenius. Czech Power Network. Presentation of 2.A, 2.G and 3.D Secondary School of Electrical Engineering. Michal Pánovec, Petr Časta, Lucie Halas, Martin Maur, Jan Polák and Jakub Tichý. History of electricity in the Czech republic. František Křižík (1847 -1941)
E N D
Czech Power Network Presentation of 2.A, 2.G and 3.D Secondary School of Electrical Engineering Michal Pánovec, Petr Časta, Lucie Halas, Martin Maur, Jan Polák and Jakub Tichý
History of electricity in the Czech republic František Křižík (1847 -1941) • improvement of arc lamp • electrical tram establishment in Prag • The first electrical train between Bechyně and Tábor
History of electricity in the Czech republic Emil Kolben (1862 - 1943) • earned huge experience in Europe and in USA • projected power station Holešovice -> the first production of alternate machine
COAL-FIRED POWER STATIONS
DĚTMAROVICE The Dětmarovice Power Station was built between 1972-1976, it is the largest classic power station in Moravia. Is situated near the town of Ostrava. Installed capacity: 4 x 200 MW
HODONÍN The Hodonín Power Station is one of the oldest in the Czech Republic. It was built between 1951-1957. Is situated near town Brno. Installed capacity: 95,60 MW
CHVALETICE Chvaletice Power Station is situated in Polabi area, about twenty kilometers to the west from the town of Pardubice. It was built between 1973-1979. Installed capacity: 4 x 200 MW
LEDVICE Ledvice PS is situated at the foothill of Krušné Mountains eastern part, between the spa towns of Teplice and Bilina. The power plant was constructed in the period of 1966-1969. Installed capacity: 2 x 110 MW
MĚLNÍK Power Plant Mělník is near the capital city Prague. The power plant was constructed between 1960-1970. Installed capacity: 4 x 110 MW
POČERADY Power Plant Počerady is situated in the north-west part of the Czech Republic, nearly in the middle among the towns of Louny, Žatec, and Most. The power plant was constructed between 1970-1977. Installed capacity: 5 x 200 MW
POŘÍČÍ This power station is situated in a scenic landscape of Trutnov region, at the foothill of the Krkonoše Mountains, the highest mountains in the Czech Republic, in the eastern side of the town of Trutnov. The power plant was put into operation in 1957. Installed capacity: 3 x 55 MW
PRUNÉŘOV The Prunéřov Power Stations are the largest fossil power station complex in the Czech Republic. They are situated near the town of Chomutov. The Prunéřov I, the older of the two, began operations between 1967 and 1968 and the Prunéřov II between 1981 and 1982. Installed capacity in Prunéřov I: 4 x 110 MW Installed capacity in Prunéřov II: 5 x 210 MW
TUŠIMICE The PP Tušimice is situated near the town of Chomutov. It was put into operation in the year 1974. Installed capacity: 4 x 200 MW
TISOVÁ The PP Tisová is situated in the west side of Sokolská Basin between Krušné Mountains and Slavkovský Wood. The power plant was constructed between 1954- 1958. Installed capacity: 4 x 50 MW
HYDRO POWER STATIONS
Hydroelectric power station • Pumping power station
Types of dames in Czech • Gravitation dam
DALEŠICE The Dalešice Pumped-Storage Hydroelectric Power Station is situated near Dukovany. The power plant was constructed between 1970-1978. Installed capacity: 4 x 112,5 MW Type of turbine: Francis
DLOUHÉ STRÁNĚ The Dlouhé Stráně Pumped-Storage Hydro Power Station is situated in Moravia, near Loučná nad Desnou in the distric of Šumperk. Construction on the PS beganin May 1978 and in 1996 was put into operation. Installed capacity: 2 x 325 MW Type of turbine. Francis
HNĚVKOVICE The PP Hněvkovice is a small power station and is situated at the Vltava Cascade. The Hněvkovice water reservoir was build between 1986 and 1992. Installed capacity: 2 x 4,8 MW Type of turbine: Kaplan
KOŘENSKO The Kořensko is a small power station situated at the Vltava Cascade and built together with the Hněvkovice power station. Installed capacity: 2 x 1,9 MW Type of turbine: Kaplan
KAMÝK The PP Kamýk is also situated at the Vltava Cascade. The power station was put into operation in the year 1961. Installed capacity: 4 x 10 MW Type of turbine: Francis
LIPNO It is situated at the Vltava Cascade. Lipno I was built between 1953-1958, and put into operation in the year 1959. Lipno II was put into operation in the year 1957. Installed capacity Lipno I: 2 x 60 MW Lipno II: 1 x 1,5 MW Type of turbine: Lipno I: Francis Lipno II: Kaplan
MOHELNO The Mohelno power plant is situated near the town Dalešice. The power station was put into operation between 1961-1962. Installed capacity: 2 x 91 MW Type of turbine: Kaplan
ORLÍK This power station is situated at the Vltava Cascade. The power plant was constructed between 1954-1961 and put into operation in the year 1962. Installed capacity: 2 x 91MW Type of turbine: Kaplan
SLAPY This PS is also situated at the Vltava Cascade. The power plant was constructed between 1949-1955 and put into operation in the year 1955. Installed capacity: 3 x 48 MW Type of turbine: Kaplan
ŠTĚCHOVICE This power station is situated at the Vltava Cascade at the end of the World War II. It was put into operation between 1943-1944. Installed capacity: 2 x 11,25 MW Type of turbine: Kaplan
VRANÉ The power station Vraná is situated at the Vltava Cascade and was constructed between 1930-1936. Installed capacity: 2 x 6,94 MW Type of turbine: Kaplan
ŽELINA This is a small power station near Tušimice. It operated between 1908 and 1925, and in the Year 1994 was put into operation again. Installed capacity: 450 kW
NUCLEAR POWER STATIONS
Nuclear power stations in the Czech republic • Dukovany • Temelín
DUKOVANY The Dukovany Nuclear Power Station is situated approximately 30 km southeast of Třebíč. The construction was started in 1974 and was finished in the year 1978.The first reactor was put into operation on 4 May 1985, and the last (the fourth) unit on 20 July 1987. Installed capacity: 4 x 400 MW Type of reactor: VVER 440
TEMELÍN The Temelín Power Nuclear Station is situated about 24 km away from České Budějovice. The construction was started 1987 and has been completed in July 2000, but put into the operation was in the year 2002. Installed capacity: 2 x 1000 MW Reactor type: VVER 1000
WIND POWER STATIONS
Wind charger • most wind chargers in private property
MRAVENEČNÍK The Solar Power Station Mravenečník is situated in Jeseníky Mountains. It was put into operation in the year 1998. Installed capacity: 1,165 MW
SOLAR POWER STATIONS
Solar power station • Only one power station, which uses solar energy • Minimal share on power supply