30 likes | 156 Views
Wire scanner induced quench in MBRB (D4) on 1 Nov 2010 at 15h40 Timing of QPS and BLM Arjan Verweij, TE-MPE Mariusz Sapinski, BE-BI. To do: compare Fluka, BLM, and QP3 for the integrated heat deposition before the green line ( t - t dump <-37 ms).
E N D
Wire scanner induced quench in MBRB (D4) on 1 Nov 2010 at 15h40 Timing of QPS and BLM Arjan Verweij, TE-MPE Mariusz Sapinski, BE-BI
To do: compare Fluka, BLM, and QP3 for the integrated heat deposition before the green line (t-tdump<-37 ms)