An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. eskomcsp / solar augmentation conference the epc and o&m contractor's perspective 26 August 2013 Alessandra Pardini

  2. global csp CSP around the World

  3. global csp • Global CSP up to January 2013 (figures include ISCC and ISCoal) • Total installed CSP: 2553 MW • Total installed CSP (2012): 811.5 MW - 31.8 % of total • Total installed CSP prior to 2006: 354 MW • Total installed CSP (2006 - 2012): 2199 MW • Total installed CSP in USA: 506 MW - 19.8 % of total • Total installed CSP in USA (2012): 0 MW • Total installed CSP in Spain: 1954 MW - 76.5 % of total • Total installed CSP in Spain 2012: 802.5 MW - 100 % of total (source: CSP World)

  4. global csp Projects: • Largest single operational project (parabolic trough): • 100 MW Shams 1 in Abu Dabi • Companies: Abengoa Solar, Masdar and Total • EPC: Abener, Abengoa, Teyma • O&M: Abengoa Solar • Largest single operational project (central receiver): • 29 MW Coalinga in California: Chevron • Company: Chevron • Project developer: BrightSourceEnergy

  5. Largest under construction: • 377 MW (central receiver) Ivanpah SEGS in Primm, California • Companies: BrightSourceEnergy, Google, NRG Energy • EPC: Bechtel Engineering • O&M: NRG Energy • Largest CSP facility: • Total of 354 MW SEGS - Solar Energy Generating System (parabolic trough) • Consisting of 9 individual plants in 3 locations • Installed capacity of 14 MW (SEGS I) up to 80 MW (SEGS VIII and IX) • Developer: Luz Industries (now BrightSource Energy) • Current owners: Cogentrix (SEGS I and II), NextEra Energy Resources (SEGS III – IX)

  6. south africa CSP locally

  7. CSP in south africa • Background on REIPP • Integrated Resources Plan for Electricity 2010 – 2030 (IRP 2010) recognises the need for new generation capacity to ensure the continued uninterrupted supply of electricity to South Africa. • Pursuant to this, the Department of Energy issued the First Determination, on 1 August 2011. This allocated 3725 MW to be procured, spread across various forms of renewable energy. The Second Determination, on 12 December 2012, allocated a further 3200 MW across these technologies. • The allocated amounts broadly align with the capacity allocated in terms of IRP (Integrated Resources Plan) 2010. • The Renewable Energy Independent Power Production procurement programme gives effect to the First and Second Determinations (REIPP). The REIPP programme is run by the Department of Energy, and the energy generated is purchased by Eskom.

  8. CSP in south africa • Background continued… • The REIPP RFP contemplates that renewable energy will be procured in a series of "Bid Windows". For each window, competitive Bids are submitted and Preferred Bidders are appointed thereafter. • So far, Rounds 1 and 2 have been concluded, with most Round 1 projects under construction, and Round 2 projects in the late developmental stages. • In terms of the First and Second Determinations, CSP was allocated 200 MW, followed by 400 MW, respectively. 150 MW of CSP was awarded in Round 1, with a further 50 MW awarded in Round 2.

  9. csp in south africa • Projects in South Africa - Operational demonstration and pilot plants • BBEnergyLiner Fresnel demo plant: 0.08 MW • Operation start date: November 2010 • BBEnergyEskom Fresnel pilot plant: 0.15 MW • Operation start date: January 2013

  10. csp in south africa • Under construction: • KaxuSolar One: 100 MW parabolic trough (1st REIPP Bid Window) • Developer: Abengoa, IDC • EPC: Abener, Teyma • O&M: AbengoaSolar

  11. csp in south africa • Under construction • KhiSolar One: 50 MW central receiver (1st REIPP Bid Window) • Developer: Abengoa, IDC • EPC: Abener, Teyma • O&M: Abengoa Solar

  12. csp in south africa • Under construction (as of August 2013) • Bokpoort: 50 MW parabolic trough (2nd REIPP Bid Window) • Developer: Acwa Power International • EPC: Acciona Energia, SENER, TSK • O&M: Nomac, Investment in Africa Energy Services

  13. csp in south africa • Planned: • Eskom CSP Plant: 100 MW central receiver (Webber Wentzel) • Finance: World Bank, Clean Technology Fund, African Development Bank, AgenceFrançaise de Develop • Engineering and Project Management: Tractebel Engineering (GDF-Suez), Astrom Technical Advisors, PD Naidoo & Associates (source: www.tractabel-engineering-gdfsuez.com)

  14. csp in south africa • REIPP Round 3: • For Round 3, 200 MW allocated to CSP. • Webber Wentzel has been involved in one CSP project in Round 3 - Abengoa 100 MW CSP. • Another likely Round 3 project - Mestimatala 50 MW CLFR (Linear Fresnel) is "Ready for Bidding" (source: amplesolar.com) • GDF-Suez has also submitted a CSP bid for Round 3

  15. csp in south africa • CSP Plants in South Africa (map data source: AfriGIS (Pty) Ltd) Blue operational Yellow construction Green development / planned Bokpoort is also now under construction

  16. epc contractors REIPP and EPC

  17. EPC Contractors in REIPP? • The EPC Contractors in REIPP are typically international firms. The international firms that have been involved in South Africa in the CSP sphere thus far are: • GDF-Suez S.A. - French multinational electric utility company, headquartered in Paris which operates in the fields of electricity generation and distribution, natural gas and renewable energy: • involved in the Eskom CSP Project via TractebelEngineering.

  18. EPC Contractors in REIPP? • Abengoa - Spanish multinational corporation, which includes companies in the domains of energy, telecommunications, transportation, and the environment; Abengoa Solar, a subsidiary, is focussed on design, financing and construction / operation of PV and CSP projects: • Involved in the Khi and Kaxu CSP projects locally, and construction of the operational Shams 1 (100 MW) parabolic trough plant, discussed above. • Involved in EPC for the first commercial central receiver (solar power tower) CSP plant, PS10 Solar Power Plant (11 MW) in Seville, Spain in 2007. • Acciona Energia - Spanish company based in Madrid, subsidiary of Acciona, involved in developing renewable energy projects, including small hydro, biomass, solar energy and thermal energy, and the marketing of biofuels. • Involved in several Round 2 projects - Bokpoort (50 MW CSP).

  19. Key Issues – EPC (REIPP)

  20. O&M Contractors O&M and REIPP

  21. Key Issues – O&M (REIPP)

  22. WEBBER WENTZEL • Alessandra Pardini • +27 11 530 5007 / 5244 • +27 82 978 4449 • alessandra.pardini@webberwentzel.com THANK YOU