160 likes | 203 Views
xNOTAM Project (EUROCONTROL). EUROCONTROL AIM Strategy. AIM. Services. Equipments. People. Digital NOTAM. Information. Optimal benefit of resources Synchronisations of events and their consequences. Data centric. Objectives. for people. for machines. AIP. NOTAM. EAD (2007).
E N D
EUROCONTROL AIM Strategy AIM Services Equipments People Digital NOTAM Information • Optimal benefit of resources • Synchronisations of events • and their consequences Data centric
Objectives for people for machines AIP NOTAM EAD (2007) DATA
Why digital NOTAM • Safety • SESAR (Single European Sky - ATM Research) • 2020: safety x 10 • Current situation • NOTAM overwrite database • Digital NOTAM can help
Why digital NOTAM TWR ATIS PIB Could avoid such situations !?!
Why digital NOTAM 56 feet
Why digital NOTAM Current text PIB • AIXM Tempdelta • Reduced TORA • WIP • What digital NOTAM could have changed
Why digital NOTAM • AIXM Tempdelta • Reduced TORA • WIP • What digital NOTAM could have changed
Why digital NOTAM • AIXM Tempdelta • Reduced TORA • WIP • What digital NOTAM could have changed
Why digital NOTAM AIP AIP NOTAM NOTAM <AIXM/XML> eliminate manual re-typing of information • Efficiency avoid misunderstandings … I assume"before" the threshold rather than "beyond“ ?!… … a crane 520 m in front of THR 24 …
Why digital NOTAM enabler • Capacity
Project risks ? • What if … • no immediate return of the investment? • regional isolated implementation? • non-conformity with end-user specifications? Mitigation
2007 – xNOTAM Trial • When • Aug 2007 – March 2008 (tentative) • Coordination with FAA trial • same messages • 2 sources for test clients • same time • Will keep you informed on www.aixm.aero