110 likes | 263 Views
Coast Guard Logistics Information Management System (CG-LIMS). CG-9334 | CDR Daniel P. Taylor COMDT | Information Brief | 01 September 2009. Connected Standardized Delivered in segments. Vision
E N D
Coast Guard Logistics Information Management System (CG-LIMS) CG-9334 | CDR Daniel P. Taylor COMDT | Information Brief | 01 September 2009
Connected • Standardized • Delivered in segments Vision To modernize logistics information systems to support common logistics processes across the enterprise UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
Connected logistics & finance systems • Properly integrate logistics system with core accounting system. • Integration is greatest project risk. Financial Management (CFO) Data MPC ----------------------------------------------------------------------------------------------------------------- Data CG-LIMS CG-LIMS UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
Connected maintenance and supply CG-LIMS • Answers “Do I have the parts to execute the maintenance plan?” + MM SCM TIM CM • Configuration Mgt (CM) and • Technical Information Mgt (TIM) drive • Maintenance Mgt (MM), which drives • Supply Chain Mgt (SCM) UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
Connected to deployed assets Support assets operating for extended periods with limited network connectivity UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
Standardized product line management O-Level & D-Level CM Total Asset Visibility CG-LIMS Optimized to support common enterprise processes + MM SCM TIM CM CG Modernization Product Line Mgt Enterprise Decisions Availability OpTempo Cost UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
Delivered in segments Analyze / Select Obtain/Prod/Deploy Deploy / Support Segment 1: Configuration and Maintenance Management • Discrete segments • Start with CM • Deployed to aviation asset first • Enables continued transformation ADE 2 ADE 3 IOC UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
Delivered in segments (notional) Analyze / Select Obtain/Prod/Deploy Deploy / Support Segment 1: Configuration and Maintenance Management ADE 2 ADE 3 IOC Segment 2: Supply Chain Management Analyze/Select Obtain/Prod/Deploy Deploy / Support ADE 2B ORR Segment 3: Technical Data Management Analyze/Select Obtain/Prod/Deploy Deploy/Support ADE 2B ORR Segment 4: Financial Integration Analyze/Select Obtain/Prod/Deploy Deploy/Support ADE 2B ORR Segment 5: HR & Ext Integr’n Analyze/Select Obtain/Prod/Deploy FOC ADE 2B ORR UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
iCommandant blog shares vision UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
Using enterprise systems for transparent project management UNCLAS | CG-LIMS Info Brief | CG-9334 | CDR Taylor | COMDT | 01 Sep 2009
CG-LIMS (OV-1) 24-Aug-2009Coast Guard Logistics Information Management System O-Level & D-Level CM Total Asset Visibility OSC CG-LIMS AOPS MISLE C4ISR & Facilities Others Private Industry Operational Tempo and Availability requirements create demand signal for support which is captured in CG-LIMS; maintenance, parts, and asset status visible to enterprise. Operational assignments and cost will be optimized; relationship measurable; budgets defendable. Financial integration is critical. Financial Management (CFO) Enterprise Decisions Availability OpTempo Data Cost MPC ----------------------------------------------------------------------------------------------------------------- Knowledge Data CG-LIMS Remote Ops support (satellite not included) + MM SCM TIM CM CG Modernization Product Line Mgt Logistics & Service Centers ForceCom OpCom CG-LIMS will support product lines in a Bi-Level maintenance model at the logistics/service centers, with Configuration Mgt (CM) fed by Tech Info Mgt (TIM), capturing Maintenance Mgt (MM) information, which will drive Supply Chain Mgt (SCM) delivering operational capability. DoD & OGA’s