JRA2: Status presentation ETICS AH meeting Budapest, 22-24Iune 2009 Eva Takacs, 4D Soft
Overview • Stuffing and resources • Major Tasks Performed • To be discussed • Workplan for the next quarter • Conclusion
Stuffing • 4D SOFT • István Forgács – partner representative, member of PMB • Éva Takács – JRA2 WP leader, since January 50% until April 50%, then 100% • István Forgács memember of PMB • András Milassin - the technical proxy of Eva working 50% • József Kuti is technical member of our team working 100%
Stuffing • Sztaki • Robert Lovas – partner representative, member of PMB • Karoczkai Krisztián – gUse main architect/developer • Ács Sándor - infrastructure • Leszák András – Sztaki DesktopGrid project in ETICS
Test Tool Registration System • Complete redesign of the GUI has been performed • Main functionalities mainly remained the focus has been on the intuitiveness of the GUI • Registration process is done in steps • Information system on the plugins have been implemented • Advanced tag based search /filtering functionality • The design of the associated help system has been started
org.etics.test-systemorg.etics.testsuites.test-system • Subsystem in org.etics for our development, ‘marketing project’ for 4D SOFT showing ETICS build/test features • The modelled environment is ready (on going work) • Local and remote builds are working • Test plugins are running • Deployment on test environment is ready • Web-service testing scenario is working (will be improved) • Acceptance test scenario is under investigation • Modelling org.etics.testsuites.test-system (multinode counterpart) is ready (on going work) – transition to multinode • Designed a two node deployment scenario
Workflow Designer • the concepts and processes of the multimode test scenario between SA1 and JRA2 has been clarified • the required changes have been done, restructuring of some parameters/elements • abstract/concrete workflow update mechanism improved • xml/xsd, example client for xml generation
Sztaki DesktopGrid project • The modelling environment is under work • Local builds are running • Remote builds ‘almost’ running • Valgrind plugin for testing memory leaks is running
To be discussed • Technical details • Multinode: a new checkpoint • ETICS Test-system imtegration to the ETICS web portal • Plugins running with etics-build (in some situations not running), etics-test (not running) • Organisational problems • Problem for JRA2 that no real user requirements are received – (should JRA2 be more proactive ????) • To overcome this problem the two example projects (GWT project – as example of a general purpose web application and the DesktopGrid project from Sztaki – a grid application) are considered as reference projects.
Workplan for the next quarter • Multinode tests • Checkpoint now !!! • Workflow Designer • checkpoint now !!! • Test Tool Registration System • Finishing the implementation, testing • Integrating into ETICS core – checkpoint now !!! • Acceptance test scenario • An utility for ‘Selenium’ test running is under investigation