1 / 12

JRA2: Status presentation

JRA2: Status presentation. ETICS AH meeting Budapest , 22 -2 4 Iune 2009. Eva Takacs, 4D Soft. Overview. Stuffing and resources Major Tasks Performed To be discussed Workplan for the next quarter Conclusion. Stuffing. 4D SOFT István Forgács – partner representative, member of PMB

naomi
Download Presentation

JRA2: Status presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JRA2: Status presentation ETICS AH meeting Budapest, 22-24Iune 2009 Eva Takacs, 4D Soft

  2. Overview • Stuffing and resources • Major Tasks Performed • To be discussed • Workplan for the next quarter • Conclusion

  3. Stuffing • 4D SOFT • István Forgács – partner representative, member of PMB • Éva Takács – JRA2 WP leader, since January 50% until April 50%, then 100% • István Forgács memember of PMB • András Milassin - the technical proxy of Eva working 50% • József Kuti is technical member of our team working 100%

  4. Stuffing • Sztaki • Robert Lovas – partner representative, member of PMB • Karoczkai Krisztián – gUse main architect/developer • Ács Sándor - infrastructure • Leszák András – Sztaki DesktopGrid project in ETICS

  5. Major tasks performed

  6. Test Tool Registration System • Complete redesign of the GUI has been performed • Main functionalities mainly remained the focus has been on the intuitiveness of the GUI • Registration process is done in steps • Information system on the plugins have been implemented • Advanced tag based search /filtering functionality • The design of the associated help system has been started

  7. org.etics.test-systemorg.etics.testsuites.test-system • Subsystem in org.etics for our development, ‘marketing project’ for 4D SOFT showing ETICS build/test features • The modelled environment is ready (on going work) • Local and remote builds are working • Test plugins are running • Deployment on test environment is ready • Web-service testing scenario is working (will be improved) • Acceptance test scenario is under investigation • Modelling org.etics.testsuites.test-system (multinode counterpart) is ready (on going work) – transition to multinode • Designed a two node deployment scenario

  8. Workflow Designer • the concepts and processes of the multimode test scenario between SA1 and JRA2 has been clarified • the required changes have been done, restructuring of some parameters/elements • abstract/concrete workflow update mechanism improved • xml/xsd, example client for xml generation

  9. Sztaki DesktopGrid project • The modelling environment is under work • Local builds are running • Remote builds ‘almost’ running • Valgrind plugin for testing memory leaks is running

  10. To be discussed • Technical details • Multinode: a new checkpoint • ETICS Test-system imtegration to the ETICS web portal • Plugins running with etics-build (in some situations not running), etics-test (not running) • Organisational problems • Problem for JRA2 that no real user requirements are received – (should JRA2 be more proactive ????) • To overcome this problem the two example projects (GWT project – as example of a general purpose web application and the DesktopGrid project from Sztaki – a grid application) are considered as reference projects.

  11. Workplan for the next quarter • Multinode tests • Checkpoint now !!! • Workflow Designer • checkpoint now !!! • Test Tool Registration System • Finishing the implementation, testing • Integrating into ETICS core – checkpoint now !!! • Acceptance test scenario • An utility for ‘Selenium’ test running is under investigation

  12. Status and schedule