An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vertical Test Stand Update C.M. Ginsburg (Fermilab) For the VTS group 31.August.2006

  2. Cryostat Procurement • Contacted vendors • Ability Engineering (South Holland, IL), • American Magnetics (Oak Ridge, TN), • Cryofab (Kenilworth, NJ) • Cryogenic Plants and Services (Linde), (Tulsa, OK) • CVPI (Emmaus, PA) • Meyer Tool (Oak Lawn, IL) • PHPK (Columbus, OH) • xyz company (WI) • Plan • Detailed bid evaluation criteria exist • Ron Evans to request more detailed milestone schedule and contingency plan • VTS group to evaluate bids by Tuesday • Award contract by end of next week Two responses C.M. Ginsburg ILC/SRF mtg

  3. RF System Design Review • Charge to the committee • Assess and comment on all technical aspects of the IB1 VTS RF system design, and • Provide a written report.  • Thanks to Review Committee members: • Ralph Pasquinelli (chair) • Jim Steimel • Brian Chase • Chuck Worel • John Reid • Wolf-Dietrich Moeller • Dates • Review: 24.August • Report from committee: 30.August • Many helpful comments, no show-stoppers • Response to committee: expect ~8.September C.M. Ginsburg ILC/SRF mtg