An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Staus of MORE and BepiColombo

  2. MORE: instrument PDR completed (27 Nov. 2008) EID-B close to completion Test and Calibration Plan: work in progress; issue 1 expected for next PM in June Ground station: some progress on the use of SRT (Sardinia Radio Telescope); no NASA support at the moment Concerns: wheel desaturation manouuvers every 12 h, with large delta-V (5 cm/s) Payload switch off near Mercury’s pericenter, X/Ka link off at pericenter MORE Status MORE DPDR 27-28 Nov. 2008

  3. BOT EOT DSM1 max effect DSM2 BOT 0h 8h 10h 16h 22h 24h Wheel Desaturation (communication from R. Schulte) x along track, y radial (nadir), z out of plane nominally zero, due to thruster orientation Calibration of possible to 5% Sequence Of Events: T1 T2 T3 T0 T4 MORE DPDR 27-28 Nov. 2008

  4. Summary of effects Displacements after 6 h from manoeuvers, in meters, assuming knowledge of DV to 5% MORE DPDR 27-28 Nov. 2008

  5. Effects of residual DVx Along-track, residual DV does affect the SC orbit : To fix ideas, let us assume Δx = 10 m; then knowledge of ΔVx is required to: Assuming calibration to 30%, the allowed, residual along-track DV (constraining the displacement uncertainty to 10 m) is 0.5 mm/s MORE DPDR 27-28 Nov. 2008

  6. Requirements • RSE-SPR to be updated with new requirements. • minimum interval between DSM is 12 h • knowledge of DVmust be at the minimum level of 0.15 mm/s • along track (x), 0.8 mm/s radial (y) and 2.1 mm/s normal (z) MORE DPDR 27-28 Nov. 2008