2013 Meson Hall Clean-up and Manpower Requirements (Oct 17, 2012) L.Lee. **Storage Space is still the important issue (i.e. for magnets, stands, equipment in: M13, M11, above 1A/1B). Vijay / Mark. ARIEL & Shutdown Plan (2012-2016) - DRAFT. Sept. 5, 2012. 2012. 2013. 2015. 2016. 2014.
E N D
2013 Meson Hall Clean-up and Manpower Requirements (Oct 17, 2012) L.Lee **Storage Space is still the important issue (i.e. for magnets, stands, equipment in: M13, M11, above 1A/1B)
Vijay / Mark ARIEL & Shutdown Plan (2012-2016) - DRAFT Sept. 5, 2012 2012 2013 2015 2016 2014 Major Tasks A J O J A J O J A J O J A J O J A J O Legend: 100Kw e-Beam E-Hall Available Tunnel & Bldg Avail LC (50Kw) e-Beam ARIEL & E-Linac Milestones Shutdown Jobs Construction Non Shutdown Jobs Install & Connect ELBT & EINJ-2 in E-Hall ARIEL & E-Linac Cryogenic Plant (delivery & operational) Test & Commission High Power RF System (Klystron & HVPS) Install EHBT from ACM to Target Hall Install & Connect EACA, Test & Comm Beam in E-Hall (50kW & 100kW) Complete IRIS Complete EMMA Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods Complete M20 Front end & M9A Front end work 2012 / 2013 Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services Install Kicker Ceramic beam Tube & Services Install Septum & Dipole (with services, where possible) 2014 Shutdowns Mod Vault Quads (rem. Steerers), 1BVB2, and BL1A/1B Reconfigure Vault-to-1A Shld, and beamline Shld to run 1A Remove & Store M13 Front end, Hot Blocks & Crumbling Blocks Core through M13 Block Install Kicker, UCN Beam line, Services & Controls 2015 Install Base Layer of UCN Shielding to Run BL/1A Install UCN Shielding Install UCN Spallation Target & R/Handling System, & UCN Source 2016 Complete Shielding & Commissioning Tests Dsgn Procure & Inst Procure & Inst Upgrades Hel liquefier system (and UCN upgrade)
Vijay / Mark ARIEL & Shutdown Plan (2012-2016) - DRAFT Sept. 5, 2012 2012 2013 2015 2016 2014 Major Tasks A J O J A J O J A J O J A J O J A J O Legend: 100Kw e-Beam E-Hall Available Tunnel & Bldg Avail LC (50Kw) e-Beam ARIEL & E-Linac Milestones Shutdown Jobs Construction Non Shutdown Jobs Install & Connect ELBT & EINJ-2 in E-Hall ARIEL & E-Linac Cryogenic Plant (delivery & operational) Test & Commission High Power RF System (Klystron & HVPS) Install EHBT from ACM to Target Hall Install & Connect EACA, Test & Comm Beam in E-Hall (50kW & 100kW) Complete IRIS Complete EMMA Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 Install Kicker Ceramic beam Tube & Services Install Septum & Dipole (with services, where possible) 2014 Shutdowns Mod Vault Quads (rem. Steerers), 1BVB2, and BL1A/1B Reconfigure Vault-to-1A Shld, and beamline Shld to run 1A Remove & Store M13 Front end, Hot Blocks & Crumbling Blocks Core through M13 Block Install Kicker, UCN Beam line, Services & Controls 2015 Install Base Layer of UCN Shielding to Run BL/1A Install UCN Shielding Install UCN Spallation Target & R/Handling System, & UCN Source 2016 Complete Shielding & Commissioning Tests Dsgn Procure & Inst Procure & Inst Upgrades Hel liquefier system (and UCN upgrade)
ARIEL & Shutdown Plan (2012-2016) - DRAFT Oct. 17, 2012 2012 2013 2015 2016 2014 Major Tasks A J O J A J O J A J O J A J O J A J O Legend: 100Kw e-Beam E-Hall Available Tunnel & Bldg Avail LC (50Kw) e-Beam ARIEL & E-Linac Milestones Shutdown Jobs Construction Non Shutdown Jobs Install & Connect ELBT & EINJ-2 in E-Hall ARIEL & E-Linac Cryogenic Plant (delivery & operational) Test & Commission High Power RF System (Klystron & HVPS) Install EHBT from ACM to Target Hall Install & Connect EACA, Test & Comm Beam in E-Hall (50kW & 100kW) Complete IRIS Complete EMMA Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 Install Kicker Ceramic beam Tube & Services July-2013: M11,M13 floor area cleared Install Septum & Dipole (with services, where possible) 2014 Shutdowns Mod Vault Quads (rem. Steerers), 1BVB2, and BL1A/1B Reconfigure Vault-to-1A Shld, and beamline Shld to run 1A Remove & Store M13 Front end, Hot Blocks & Crumbling Blocks Core through M13 Block Install Kicker, UCN Beam line, Services & Controls 2015 Install Base Layer of UCN Shielding to Run BL/1A Install UCN Shielding Install UCN Spallation Target & R/Handling System, & UCN Source 2016 Complete Shielding & Commissioning Tests Dsgn Procure & Inst Procure & Inst Upgrades Hel liquefier system (and UCN upgrade)
Comments: **Cleanup (main issue): Identifying Storage Space of Critical Importance - Find/Build new storage space on-site (?) - Store off-site (?) 1. Assess/Vault mods: Cleanup issues; Vault mods (July-Dec/2012) M11 Assess Cleanup issues (M11 platform, services, cables) M13 Assess Cleanup issues (Storage/Disposal of magnets, services, cables) 1A/1B Determine “ownership” of equipment on 1A/1B shielding blocks (email notice, with link to pictures of equipment) (Jan-Mar/2013) Vault Rewire Vault Quads for Steering Capability during 2013 Shutdown (Shutdown Work Request submitted) Allows for testing in 2013, with “Existing” & “New” steering available Setup shunts on 1VQ4 and 1VQ5, Run shunt cables (#12, P.S.’s to Quads) Work Estimate: 2 weeks; 1 BL, 1 Contractor (Electrician)
Comments: 2. Cleanup: M11 experiment area and above 1A/1B shielding blocks M11 Platform Reroute services & cables; Clear & Remove platform Work Estimate4 weeks; 1 crane operator, 2 riggers, 1 BL Cleanup M11 expt area and above 1A/1B shielding blocks Clear M11 area for temporary storage (activated blocks) or staging area (for 2014 S/D) Clear area above 1A/1B for 2014 S/D (Excavate shielding in MH SouthWest corner) Work Estimate2.8 months (11 weeks); 1 crane operator, 2 riggers, 1 BL Flexible Does not impact UCN 2014 S/D
Comments: 2. Cleanup: M11 experiment area and above 1A/1B shielding blocks (Jan-Sep/2013) Jan.2-Mar.29 M11 Platform Reroute services & cables; Clear & Remove platform Work Estimate4 weeks; 1 crane operator, 2 riggers, 1 BL Apr.2-Aug.30 Cleanup M11 expt area and above 1A/1B shielding blocks Work Estimate2.8 months (5m at 55%); 1 crane operator, 2 riggers, 1 BL (Jan-Sep/2013) Jan.2-Feb.28 M11 Platform Work Estimate4 weeks; 1 crane operator, 2 riggers, 1 BL Mar.1-Aug.30 Cleanup M11 expt area and above 1A/1B shielding blocks Work Estimate12 weeks; 1 crane operator, 2 riggers, 1 BL [ 6 weeks for M11 work, 6 weeks for 1A/1B work ] *Assuming storage space issue solved (Previous draft plan – July-2012) Flexible Does not impact UCN 2014 S/D (New draft plan)
Comments: 3. Dismantle: M13 expt area (PIENU,Q6,Q7) and Infrastructure/Services Cleanup M13 Floor Area PIENU BG/Calib and remove detectors (PIENU personnel) Remove PIENU and clear M13 floor area - (Includes M11-Q6 & Q7, PACman, Quad-Triplet) Work Estimate6 weeks; 1 crane operator, 2 riggers, 1 BL Remove M13 Infrastructure Remove PIENU-M13 cables, cable trays, services Work Estimate 8 weeks; 1 crane operator, 1 rigger, 2 BL, 2 EL Removal of M13 B/L (Q1–B2) requires shutdown (in 2015)
Comments: 3. Dismantle: M13 expt area (PIENU,Q6,Q7) and Infrastructure/Services (Sep-Dec/2013) Finish Sep.15 PIENU BG/Calib and remove detectors (PIENU personnel) Sep.16-Dec.20 Remove PIENU and clear M13 floor area (Includes M11-Q6 & Q7, PACman, Quad-Triplet) Work Estimate6 weeks (3m at 50%); 1 crane operator, 2 riggers, 1 BL (May-Dec/2014) May.1-Aug.1 Remove PIENU-M13 infrastructure & services Work Estimate 8 weeks; 1 crane operator, 1 rigger, 2 BL, 2 EL (Apr-July/2013) Finish Mar.29 PIENU BG/Calib and remove detectors (PIENU personnel) Apr.1-Jun.30 Remove PIENU and clear M13 floor area Work Estimate6 weeks; 1 crane operator, 2 riggers, 1 BL (July-Oct/2013) Jul.1-Sep.30 Remove PIENU-M13 infrastructure & services Work Estimate 8 weeks; 1 crane operator, 1 rigger, 2 BL, 2 EL (Previous draft plan – July-2012) (New draft plan)
ARIEL & Shutdown Plan (2012-2016) - DRAFT Oct. 17, 2012 2012 2013 2015 2016 2014 Major Tasks A J O J A J O J A J O J A J O J A J O Legend: 100Kw e-Beam E-Hall Available Tunnel & Bldg Avail LC (50Kw) e-Beam ARIEL & E-Linac Milestones Shutdown Jobs Construction Non Shutdown Jobs Install & Connect ELBT & EINJ-2 in E-Hall ARIEL & E-Linac Cryogenic Plant (delivery & operational) Test & Commission High Power RF System (Klystron & HVPS) Install EHBT from ACM to Target Hall Install & Connect EACA, Test & Comm Beam in E-Hall (50kW & 100kW) Complete IRIS Complete EMMA Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 Install Kicker Ceramic beam Tube & Services July-2013: M11,M13 floor area cleared Install Septum & Dipole (with services, where possible) 2014 Shutdowns Mod Vault Quads (rem. Steerers), 1BVB2, and BL1A/1B Reconfigure Vault-to-1A Shld, and beamline Shld to run 1A Remove & Store M13 Front end, Hot Blocks & Crumbling Blocks Core through M13 Block Install Kicker, UCN Beam line, Services & Controls 2015 Install Base Layer of UCN Shielding to Run BL/1A Install UCN Shielding Install UCN Spallation Target & R/Handling System, & UCN Source 2016 Complete Shielding & Commissioning Tests Dsgn Procure & Inst Procure & Inst Upgrades Hel liquefier system (and UCN upgrade)
ARIEL & Shutdown Plan (2012-2016) - DRAFT Oct. 17, 2012 2012 2013 2015 2016 2014 Major Tasks A J O J A J O J A J O J A J O J A J O Legend: 100Kw e-Beam E-Hall Available Tunnel & Bldg Avail LC (50Kw) e-Beam ARIEL & E-Linac Milestones Shutdown Jobs Construction Non Shutdown Jobs Install & Connect ELBT & EINJ-2 in E-Hall ARIEL & E-Linac Cryogenic Plant (delivery & operational) Test & Commission High Power RF System (Klystron & HVPS) Install EHBT from ACM to Target Hall Install & Connect EACA, Test & Comm Beam in E-Hall (50kW & 100kW) Complete IRIS Complete EMMA Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 Install Kicker Ceramic beam Tube & Services Install Septum & Dipole (with services, where possible) 2014 Shutdowns Mod Vault Quads (rem. Steerers), 1BVB2, and BL1A/1B Reconfigure Vault-to-1A Shld, and beamline Shld to run 1A Remove & Store M13 Front end, Hot Blocks & Crumbling Blocks Core through M13 Block Install Kicker, UCN Beam line, Services & Controls 2015 Install Base Layer of UCN Shielding to Run BL/1A Install UCN Shielding Install UCN Spallation Target & R/Handling System, & UCN Source 2016 Complete Shielding & Commissioning Tests Dsgn Procure & Inst Procure & Inst Upgrades Hel liquefier system (and UCN upgrade)
2013 Meson Hall Cleanup Plan (Durations, not Actual Work – i.e. typically 50% FTE’s or less) Legend: Shutdown Jobs 2013 Non Shutdown Jobs A F M M J A N D J S O J Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Shutdowns Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3
2013 Meson Hall Cleanup Plan ( Durations [dashed] & Actual Work [solid, 100% FTE’s] ) Legend: Legend: Shutdown Jobs Shutdown Jobs 2013 (Reference scenario) Non Shutdown Jobs Non Shutdown Jobs A F M M J A N D J S O J Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Shutdowns Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 July-2013: M11, M13 floor area cleared 2013 (Alternate scenario 1) A F M M J A N D J S O J Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Shutdowns Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 Jun-2013: M11, M13 floor area cleared Tasks appear to divide up into 6-8 week “blocks” **Ideally, would like crew (1 crane op, 2 riggers, 1 BL) for 6 weeks at a time
2013 Meson Hall Cleanup Plan ( Durations [dashed] & Actual Work [solid, 100% FTE’s] ) Legend: Legend: Shutdown Jobs Shutdown Jobs 2013 (Alternate scenario 2) Non Shutdown Jobs Non Shutdown Jobs A F M M A N D J S J O J Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Shutdowns Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 2013 (Alternate scenario 3) A F M M J A N D J S O J Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Shutdowns Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 Tasks appear to divide up into 6-8 week “blocks” **Ideally, would like crew (1 crane op, 2 riggers, 1 BL) for 6 weeks at a time
2013 Meson Hall Cleanup Plan ( Durations [dashed] & Actual Work [solid, 100% FTE’s] ) 2013 (Alternate scenario 2) A F M M A N D J S J O J Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Shutdowns Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 He Liquefier Sys: Clean out & Reconfig Mezzan. (crew:0.5 man-mth) He Liquefier Sys: Equip arrival, install (BL:1 man-mth) He Liquefier Sys: Equip arrival, inst. services (BL:0.75 man-mth) 2013 (Alternate scenario 3) A F M M J A N D J S O J Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods 1 Complete M20 Front end & M9A Front end work 2012 / 2013 Shutdowns Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) 2 Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services 3 He Liquefier Sys: Clean out & Reconfig Mezzan. (crew:0.5 man-mth) He Liquefier Sys: Equip arrival, install (BL:1 man-mth) He Liquefier Sys: Equip arrival, inst. services (BL:0.75 man-mth)
Summary: (Reference Scenario) 1. Vault mods: Cleanup issues; BL1B & Vault mods Jan.2-Mar.29 Rewire Vault Quads for Steering Capability Work Estimate2 weeks; 1 BL, 1 Contractor (Electrician) 2. Cleanup: M11 experiment area and above 1A/1B shielding blocks Jan.2-Feb.28 M11 Platform Work Estimate4 weeks; 1 crane operator, 2 riggers, 1 BL Mar.1-Aug.30 Cleanup M11 expt area and above 1A/1B shielding blocks Work Estimate12 weeks; 1 crane operator, 2 riggers, 1 BL 3. Dismantle: M13 expt area (PIENU,Q6,Q7) and Infrastructure/Services Finish Mar.29 PIENU BG/Calib and remove detectors (PIENU personnel) Apr.1-Jun.30 Remove PIENU and clear M13 floor area Work Estimate6 weeks; 1 crane operator, 2 riggers, 1 BL Jul.1-Sep.30 Remove PIENU-M13 infrastructure & services Work Estimate 8 weeks; 1 crane operator, 1 rigger, 2 BL, 2 EL Person-Week Sums Shutdown & Meson-Hall Cleanup 2013[ Time Estimate in Person-Weeks] 2013 ShutdownM11 Platform (2013 )2013 non-Shutdown BL [2] PG [12] PG [70] Contr [2] BL [4] BL [34] EL [16]
Summary (cont’d): Some flexibility in scheduling of Tasks and Subtasks - For efficiency reasons (D.P.), best to have “full-time” crew for 6 weeks at a time **Cleanup (main issue): Identifying Storage Space of Critical Importance - Find/Build new storage space on-site (?) (any possible storage solutions left on-site?) - Store off-site (?) Determine “ownership” of equipment above 1A/1B - email notice (link to pictures of equipment)
ADDITIONAL SLIDES
Any possible storage solutions left on-site? MH ISAC II ISAC I Cycl Gg RH Construction ARIEL Constr. He Fac PH Hh M.S. MOB A Ff D.O./Stores Plant Grp.
Comments: 4. UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section After: 1UM6 1UB2 KICKER BEAMTUBE 1VM4 1BVB2 1VVA4 TPUMP 1U Septum 1AUM5 1UBB2
Comments: 4. UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section
Comments: 4. UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section Late Dec/2013 Remove large shielding blocks outside (3 days) Start Jan.2/2014 Week 1 RPG survey & prepare for S/D work Week 2 Remove Warm blocks (layers A-D); Disconn.services; Remove 1A vault comp.’s Week 3 Cleanup/Layout BL1U; Specify location for coring of Immovable-block (and tx.) Week 4 - 5 1BVB2 mods (and 1B mods) Week 5 - 7 Install stands for kicker,septum,1UB2; Install & Align kicker-beamtube Week 8 Install & Align septum magnet Week 9 Install & Align 1UB2 magnet and 1UM6 Week 10 Reinstall 1A vault comp.’s; Install Notch-monitor; Install 1AUM5/1UBB2 Week 7 - 9 Install rough-in services (Electrical, Water, Air) Week 10 - 11 Finish Electrical (AC & DC), Water, Air services Week 11 Finish all vacuum connections Week 12 Leak check & ready to pull vacuum Week 13 Pull vacuum & check-out vacuum controls Week 14 General check-out and ready to cover Week 15 - 16 Restore vault & 1A shielding and prepare for beam Resources: 3 Beamlines techs (2 BL + Alignment), 13 weeks [39 person-weeks] 1 Crane Operator + 2 Riggers, 7 weeks [21 person-weeks] Vacuum Group [6 person-weeks] Services: Outside Contractors, 5 weeks [6 person-weeks] Close Up Main Work Open Up Mostly Contractors (?)
Preparations for 2014 Shutdown:(Design, Procurement, Assembly of Subsystems) Items/Subsystems Eng. DWGs Procurement Assy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A Shielding Saf./ UCN DO UCN n/a Septum Mods UCN UCN MS / UCN BL / UCN Septum Vacuum Box UCN UCN MS / UCN BL / UCN Septum Stand UCN UCN MS / UCN BL / UCN 1UAM5/1UBB2 Diag. DO MS /Diag./ ET ET / Diag. 1BVB2 Stand Mod. Eng.Div. DO MS BL Dipole Vacuum Box UCN UCN MS BL 1AM4(ToF)/1AM4.5 Diag. UCN Diag. / UCN Diag./ UCN Kicker Beamtube UCN UCN UCN BL Kicker Stand UCN UCN MS / UCNBL SEM for BL1B Diag. D.O. Diag. Diag. (M.Trinczek)
Preparations for 2014 Shutdown:[ Time Estimate in Person-Weeks ] Items/Subsystems Eng. DWGs Procurement Assy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A Shielding Saf.[3]/UCN[4] DO [7] UCN [3] n/a Septum Mods UCN [8] UCN [4] MS [2] / UCN [1] BL [10] / UCN [2] Septum Vacuum Box UCN [3.5] UCN [6] MS [6] / UCN [1] BL [6] / UCN [3] Septum Stand UCN [3.5] UCN [6] MS [5] / UCN [1] BL [4] / UCN [2] 1UAM5/1UBB2 Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7] 1BVB2 Stand Mod. Eng.Div. [1.5]DO[3]MS[2]BL[2] Dipole Vacuum Box UCN [1] UCN [6] MS [8] BL [1] 1AM4(ToF)/1AM4.5 Diag. [3] UCN [6] Diag. [2] / UCN [5] Diag. [2] / UCN [6] Kicker Beamtube UCN [3.5] UCN [5.5] UCN [3.5] BL [2.5] Kicker Stand UCN [3.5] UCN [6.5] MS [5] / UCN [2.5] BL [4] SEM for BL1B Diag. [2] D.O. [2] Diag. [3] Diag. [3] (M.Trinczek) UCN Designer (need to hire)
Person-Week Sums: Summary [ Time Estimate in Person-Weeks ] Shutdown & Meson-Hall Cleanup 2013 & 2014 2013 S/DM11 Platform (2013 )2013 non-S/D BL [4] PG [12] PG [70] BL [4] BL [34] EL [16] 2014 S/D PG [21] BL [39] Vac [6] Con.[6] Preparations for 2014 S/D (2012,2013) Safety [3] Eng.Div [1.5] DO [19] MS [34] BL [29.5] Diag. [32] ET [7] UCN.Eng [46] UCN.Des [34] UCN.Stu [17]
Preparations for 2014 Shutdown:[ Time Estimate in Person-Weeks ] (Deferral Options - Prioritized) Items/Subsystems Eng. DWGs Procurement Assy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A Shielding Saf.[3]/UCN[4] DO [7] UCN [3] n/a Septum Mods UCN [8] UCN [4] MS [2] / UCN [1] BL [10] / UCN [2] Septum Vacuum Box UCN [3.5] UCN [6] MS [6] / UCN [1] BL [6] / UCN [3] Septum Stand UCN [3.5] UCN [6] MS [5] / UCN [1] BL [4] / UCN [2] 1UAM5/1UBB2 Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7] 1BVB2 Stand Mod. Eng.Div. [1.5]DO[3]MS[2]BL[2] Dipole Vacuum Box UCN [1] UCN [6] MS [8] BL [1] 1AM4(ToF)/1AM4.5 Diag. [3] UCN [6] Diag. [2] / UCN [5] Diag. [2] / UCN [6] Kicker Beamtube UCN [3.5] UCN [5.5] UCN [3.5] BL [2.5] Kicker Stand UCN [3.5] UCN [6.5] MS [5] / UCN [2.5] BL [4] SEM for BL1B Diag. [2] D.O. [2] Diag. [3] Diag. [3] (M.Trinczek)