1 / 18

Duke Energy Carolinas Quarterly Stakeholder Meeting

Duke Energy Carolinas Quarterly Stakeholder Meeting. 2 nd Quarter 2011. Independent Entity Services Thursday, May 19, 2011 3:00 to 4:00 p.m. EDT. Agenda. Action Items from December 2, 2010 and March 17, 2011 Transition to AFC Methodology NAESB Update - Wholesale Electric Quadrant

nero
Download Presentation

Duke Energy Carolinas Quarterly Stakeholder Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Duke Energy CarolinasQuarterly Stakeholder Meeting • 2nd Quarter 2011 Independent Entity Services Thursday, May 19, 2011 3:00 to 4:00 p.m. EDT

  2. Agenda • Action Items from December 2, 2010 and March 17, 2011 • Transition to AFC Methodology • NAESB Update - Wholesale Electric Quadrant • Open Access Transmission Tariff Filings • 676-E & 729 OASIS Project • Wrap-up

  3. Action Items December 2, 2010 • Duke was asked to host a meeting between December 2nd and April 1st to address the Flowbased Methodology. • Meeting was held on March 17th • Presentation posted on the OASIS Homepage Documents > Stakeholder Meetings > Stakeholder Presentation held on 03/17/2011 March 17, 2011 • Update to the implementation of Orders 676E/729 regarding NAESB & NERC • Presentation added to today's Agenda

  4. Action Items Customer/Stakeholder Questions submitted by e-mail • Expand on 10 year Forecast of PTP transmission rates under the new formula rate. • Will be addressed during the Tariff Filings discussion today • More discussion of the NAESB plan for capturing full path on an OASIS request. • Service Across Multiple Transmission Systems (SAMTS) will be addressed during today’s NAESB update • Please discuss, if any, plans Duke has to increase transfer capability with SOCO and/or TVA. • North Carolina Transmission Planning Collaborative http://www.nctpc.net/nctpc

  5. Transition to AFC Methodology • Transitioned on March 30th, 2011 • - Originally scheduled for March 29th, 2011 • Delayed transition due to vendor issues being resolved • - Effective date of the NERC Standards on AFC - April 1st, 2011 • Independent Entity perspective – transition went well • - What were your experiences like?

  6. Transition to AFC Methodology • For more detailed information on AFC Methodology • View the following documents posted on OASIS: • Attachment C • http://www.oatioasis.com/DUK/DUKdocs/DukeCarolinaOATT.pdf • ATCID • http://www.oatioasis.com/DUK/DUKdocs/Current_Available_Transfer_Capability_Implementation_Document_-_ATCID.pdf • TRMID • http://www.oatioasis.com/DUK/DUKdocs/Current_TRM_Implementation_Document_-_TRMID.pdf • CBMID • http://www.oatioasis.com/DUK/DUKdocs/CBM_Defining_Statement.pdf • Postback Methodology • http://www.oatioasis.com/DUK/DUKdocs/Current_Postback_Methodology.pdf • Questions on the calculation of ATC • Email:DukeNCIEATC@midwestiso.org • Call: 651-632-8708

  7. NAESB Update Wholesale Electric Quadrant ServiceAcross Multiple Transmission Systems (SAMTS) (OASIS Subcommittee) • Some key aspects • Permits combination of requests and reservations over a time period to be coordinated • Only monthly and longer requests may be included (no restriction on reservations) • Requests must be submitted pre-confirmed • If one request is not accepted in full, customer may reduce or withdraw any and all requests in the group • If all requests are accepted at requested capacity, all requests must be confirmed • Time zone mismatch is permitted

  8. NAESB Update Wholesale Electric Quadrant Service Across Multiple Transmission Systems (SAMTS) – cont. (OASIS Subcommittee) • Recommendation sent to EC for approval • Formal comment period ends June 10, 2011 -- link • Technical conference on 5/20/2011 • WEQ Executive Committee to review & vote on 6/30/2011

  9. NAESB Update Wholesale Electric Quadrant • Network Service on OASIS (NITS) (OASIS Subcommittee) • Significant changes • New templates – Network reservations will need to move to the new system • New Network Customers will need to fill out an on-line application on OASIS • Existing Network Customers will not have to make a new application on OASIS • Target for EC completion in 3rd quarter 2011 • NITS work delayed while completing Service Across Multiple Transmission Systems (SAMTS) • OASIS subcommittee plans to send out draft version for informal comments early June • Next steps are dependent upon magnitude of comments received

  10. NAESB Update Wholesale Electric Quadrant Parallel Flow Visualization for Eastern Interconnect (Business Practices Subcommittee) • The WEQ Executive Committee approved the recommendation for the interim solution on 10/26/2010 (approved recommendation) • The BPS is working on a permanent solution – Options include: • Hybrid Option • Tag all Non-Firm transactions within a BA • Require upload of firmness of transmission service for each running generator every 15 minutes (Generator Prioritization) • Flowgate Allocation based on 2-day ahead, 1-day ahead and hour-ahead projected use • BPS is considering a two-tiered firm curtailment process (first-to-cut / last-to-cut) • Investigating whether this is a policy change (NAESB by-laws prevent subcommittee to recommend policy changes unless directed to do so by the Board) • May require coordination agreements for one BA’s loop flows to be granted first-to-cut priority in another BA

  11. NAESB Update Wholesale Electric Quadrant Electric Industry Registry (EIR) • Transfers TSIN Registry from NERC to NAESB • OATI will administer for NAESB • Functional Specs are completed • Should be in production 1st qtr 2012 (with training and parallel operations 4th quarter 2011) • Data will need to be registered again – not moving TSIN data to EIR • Annual registration fee will be required

  12. Open Access Transmission Tariff Filings In 2011 Duke Energy Carolinas filed an amended OATT to request FERC approval of a new formula rate for Transmission Service • The requested effective date was for June 1, 2011 • There was an intervention in favor of the filing • Radial transmission lines will be excluded from the transmission rate based on a going forward basis • The transmission system peak calculation has changed and will change again on June 1, 2011 • June, 1 2011 new rates will go into effect e-Tariff Public Viewer • http://etariff.ferc.gov/TariffList.aspx

  13. FERC Order 676-E & 729 OASIS Project • FERC 676-E & 729 Ordered on November 24, 2009 • Both orders support the NAESB standards and NERC Requirements and required an implementation date of April 1, 2011 • Re-bid of Partial Service WEQ 001-4.7 through 4.12 • Rebid Price – Complete Rebid MW – Complete • Priorities for Competing Requests WEQ 001-4.14 through 4.16 • NAESB Table 4-3 revised - Complete • Preconfirmed Priority • Duke Business Practice 3.F. Revised to coincide with Table 4-3 • OASIS Home Page General Posting Standards WEQ-001-13 / MOD-001, 004 & 008 • Links, Order and Naming Convention - Complete • ATC Information Link - ATCID, CBMID, TRMID Documents posted – Complete • `

  14. FERC Order 676-E & 729 OASIS Project • ATC Narratives and Questions WEQ 001-14, 15 & 16 • Zero ATC Narratives & Change Narrative – Complete • On OASIS >Go to > Select Narrative Attribute & Filters as desiredfilters • ATC or AFC Methodology Questions • ATC Contact Person posted on OASIS homepage – Complete • Actual & Forecasted Load WEQ 001-17 • Forecasted & Actual Daily Sys-wide (includes Native Load) and Daily Native Peak Load – Complete • On OASIS > Go to > Select > Select Filters as desired • PostbacksWEQ 001-18 • Requires a Postback Methodology document be posted on OASIS under the ATC Information Link – Complete • `

  15. FERC Order 676-E & 729 OASIS Project • Grandfathered Agreements WEQ 001-19 • GFA MW value is required to be queried on OASIS systemdatatemplate – Template Complete • Must be identified in the TP’s ATCID – Complete • Duke does not have grandfathered agreements • Rollover Rights WEQ 001-20 • Duke Business Practice 3.J has been modified to reference the 5yr/1yr requirement • webTrans Rollover functionality – Complete • webOASIS Rollover functionality – Complete • Rollover on Redirects WEQ 001-9.7 • FERC did not incorporate 001-9.7 with reference to Renewal Rights on Redirects • Once adopted by FERC webOASIS and webTrans will be upgraded to meet the requirement

  16. FERC Order 676-E & 729 OASIS Project • Conditional Curtailment Option WEQ 001-21 • CCO applies to requests for Long-term Firm Point-to-Point Transmission Service • Upon request of the Transmission Customer Duke will accommodate CCO • CCO service is treated as firm in calculation of ATC in the full amount reserved • During defined periods CCO service is moved to Transmission Product code = 6-CF • Management and accounting templates and processes – Complete • Use of CBM WEQ 001-22 / MOD-004 • Requires Posting, Tracking, Ability to query, View and Audit the use of CBM on OASIS • Must be Identified in the TP’s CBMID – Complete • Duke Energy Carolinas does not currently allocate Capacity Benefit Margins (CBM) on its ATC Paths

  17. FERC Order 729 • NERC Requirements pertaining to ATC transparency • Available Transmission System Capability - MOD-001-1a • http://www.nerc.com/files/MOD-001-1a.pdf • Capacity Benefit Margin - MOD-004-1 • http://www.nerc.com/files/MOD-004-1.pdf • Transmission Reliability Margin Calculation Methodology - MOD-008-1 • http://www.nerc.com/files/MOD-008-1.pdf • Area Interchange Methodology - MOD-028-1 • http://www.nerc.com/files/MOD-028-1.pdf • Rated System Path Methodology - MOD-029-1 • http://www.nerc.com/files/MOD-029-1a.pdf • Flowgate Methodology - MOD-30-1 • http://www.nerc.com/files/MOD-030-2.pdf

  18. Wrap-up Proposed Next Quarterly Stakeholder Meeting • Thursday, September 15, 2011 – 2 p.m. to 3 p.m. ET Customer Suggested Topics? • This is the forum for discussing emergent topics (Upcoming changes, stakeholder input) Questions and Comments

More Related