410 likes | 526 Views
Old Mill School Modernization Summer 2011. Old Mill Bond Election Project List. Not Included in the Project. Safety and Communication Replace outdated fire alarm system Replace outdated clock, bell and paging system American Disabilities Act compliance Food service kitchen compliance
E N D
Old Mill School Modernization Summer 2011
Old Mill Bond Election Project List Not Included in the Project Safety and Communication Replace outdated fire alarm system Replace outdated clock, bell and paging system American Disabilities Act compliance Food service kitchen compliance Building Systems and Renovation Repair or replace aging electrical system Upgrade inefficient lighting systems Upgrade computer wiring and infrastructure Repair or replace aging plumbing system components Repair or replace leaking or deteriorating roofs Paint interior and exterior of buildings Replace flooring Repair or replace windows, doors, hardware and signage Repair or replace damaged restroom surfaces and fixtures Repair or replace cabinets and countertops Modernize lower-level classrooms Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Site Improvements Construct solar ready covered outdoor eating area It was determined during the Public Input process and Design Development that the community and school staff did not want covered outdoor eating areas, so this was not included in the project
After Before 1960’s Addition with storefront windows Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings
After Before 1960’s Addition with storefront windows Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings
After Before 1960’s Addition with storefront windows Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings
After Before Flagpole, windows, window repair, paint, roof, lights, gutter, landscape, ramp, stairs, railings, door replaced with window
After Before Window repairs, paint, roof, lights, gutter, landscape, ramp, stairs, railings
After Before Window repairs, paint, roof, gutter, landscape, replace door, with wall walkway, ramp, and railings
After Before Non compliant doors, landing and stairs leading to nowhere Windows, window repairs, paint, roof, gutter, landscape, remove landings and stairs, replace doors with windows
After Before Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, railings, remove landings and stairs, replace doors with windows
After Before 1960’s Addition with storefront windows Windows, paint, roof, replace doors with wall, gutter, and landscape
After Before 1960’s Addition with storefront windows Windows, paint, roof, replace doors with wall, gutter, and landscape
After Before Non compliant door access, and slippery floor mats Realign walls, paint, pin-up panels, abrasive action flooring, doors, Non-wax flooring, new fire alarm, new clock bell system, and electrical upgrade
After Before Move walls for new exit doors, non-wax flooring, abrasive action flooring , Non-wax flooring, new fire alarm, new clock bell system, and electrical upgrade
After Before Non-wax flooring, abrasive action flooring, new fire alarm, new clock bell system, and electrical upgrade
After Before Non compliant door access, and slippery floor mats Realign walls, paint, pin-up panels, abrasive action flooring, and doors
Before After Door to non-complaint landings and stairs Replace door with window, window repairs, blinds, new fire alarm, new clock bell system, and electrical upgrade
After Before Door to non-complaint landings and stairs Replace door with window, window repairs, blinds, new fire alarm, new clock bell system, and electrical upgrade
After Before Classroom door at bottom of stairs Replace door with wall, paint, pin-up panels, stair treads, railings, wheel chair lift, and non-wax flooring
Before After Widen hallway, skylights, paint, pin-up panels, stair treads, railings, exit doors, cubbies, lighting, ceiling, new fire alarm, new clock bell system, and electrical upgrade, flooring
After Before Widen hallway, skylights, paint, pin-up panels, stair treads, railings, doors, cubbies, lighting, ceiling, new fire alarm, new clock bell system, and electrical upgrade, flooring
After Before Widen hallway, skylights, paint, pin-up panels, stair treads, railings, doors, cubbies, lighting, ceiling, new fire alarm, new clock bell system, and electrical upgrade, flooring
After Before New windows, replace door with wall, paint, pin-up panels, window shades, carpet, ceiling, new fire alarm, new clock bell system, and electrical upgrade
After Before Remove all TV, heater, cabinets, carpet, counter, and lighting
After Before Non-compliant stairs
After Before Sloping blacktop, tilting lunch tables Window repair, door replaced with wall, paint, roof, gutter, level lunch table landing, safety rail, new PTA Garden, black top play events
After Before Window repair, door replaced with wall, paint, roof, gutter, level lunch table landing, safety rail, striping, and black top play events
After Before Deck, paint, seat wall, level lunch table landing, new PTA Garden
After Before Paint, roof, gutter, ramps, deck and safety rail, striping
After Before Window repair, door replaced with wall, paint, roof, gutter, level lunch table landing, safety rail, striping, roof venting, and black top play events
After Before Boys restroom had an interior ramp to urinals All new
Before After Paint, and compliant concrete deck
After Before Windows, roof, new electrical service, railings, gutter, roof vents, paint, and compliant concrete deck
After Before Non-compliant stairs and railings Windows, roof, new electrical service, railings, gutter, roof vents, paint, water fountain, electrical switch gear, and seat pads
Before After Electrical service with spring running through it Electrical service moved to new location, new sub panel installed above water line
After Before Windows, roof, roof vents, new electrical service, railings, gutter, paint, seat pads, asphalt, new play structure box and surface
After Before New PE office exterior entrance, new building addition for entry doors, roof, lights, railings, stairs, gutter, paint, landing, and water fountain
After Before Non-compliant lunch benches New benches, retaining wall, and asphalt
After Before Roof, vents, and exhaust fans
After Before Roofs, gutters, vents and paint