Upto Bottom Foaming Project Monitoring - SHJ. ( Existing design Bottom support LH/RH weld with side panel. 7/3/2013. 15/2/2013. 1/3/2013. 15/1/2013. 22/2/2013. 15/3/2013. 15/10/2012. 25/12/2012. Tool Ready & FPA. Samples from vendor. 1 st trial Finish. Foaming Bottom Ready
E N D
Upto Bottom Foaming Project Monitoring - SHJ ( Existing design Bottom support LH/RH weld with side panel 7/3/2013 15/2/2013 1/3/2013 15/1/2013 22/2/2013 15/3/2013 15/10/2012 25/12/2012 Tool Ready & FPA Samples from vendor 1st trial Finish • Foaming Bottom Ready • Sealing Tape application • method fix • Process finalization • PP lot of 50no Handmade samples preparation To check m/c feasibility Drawing preparation (new bottom panel) MP
Compressor base plate modification Compressor base modification • Thickness = 1.2 mm • Thickness = 1 mm
Bottom support modification • Bottom support modified • Angle height 290mm dipping in foam. • All flanges are 25mm wide. • Angle height 254mm dipping in foam. • All flanges are 17mm wide.