March PCC M eeting Update to VGS Planning Work Group (PWG )

March PCC M eeting Update to VGS Planning Work Group (PWG ). Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 10, 2011. Approval Items Nominated to the Board: PCC Officer Nomination Motion Chair: Scott Waples , Avista

nishi
Download Presentation

March PCC M eeting Update to VGS Planning Work Group (PWG )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. March PCC Meeting Update to VGS Planning Work Group (PWG) Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 10, 2011

  2. Approval Items Nominated to the Board: • PCC Officer Nomination Motion • Chair: Scott Waples, Avista • Vice Chair: Robert Easton, WAPA • PCC Handbook Retirement • UFLS Coordinated Plan • 2010 Study Program Annual Report • BCCS Vendor Recommendation • Modification to “Overview of Policies and Procedures for Project Coordination Review, Project Rating Review and progress Reports”

  3. VGS Related Topics at PCC: • Technical Studies Subcommittee Report • WECC Wind Power Plant Dynamic Modeling Guidelines • WECC PV Plant Power Flow Modeling Guidelines • Modeling Validation Work group 2010-11 TSS report • Loads and Resources Subcommittee Report • L&R annual data request used to respond to: • NERC Long Term Reliability Assessment • WECC’s Power Supply Assessment, and • To populate data base used by TEPPC. • Two new items added: • Request for Historical hourly wind generation data • Voluntary submission of DSM and demand response data

  4. VGS Related Topics at PCC: • TEPPC report: • CTPG approved as a TEPPC Subregional Planning Group (SPG) and British Columbia is conditionally approved • NERC Reports: (refer to handouts on WECC site under March PCC documents) • Frequency Response initiative • Whitepaper on SSR of existing wind farms • IVGTF – PC approved a report on “Potential Reliability Impacts of Emerging Flexible Resources” • Next PCC Meeting: July 13-15 in Denver, CO

  5. SPG reports: • Columbia Grid: • approved report on Relative NW Benefits of local vs. remote wind generation • Joint initiatives: dynamic scheduling system to come on line, looking at benefits of combining Balancing Authorities • Colorado Coordinated Planning Group: • SB100 requires development of CREZ and transmission to meet renewable needs • Sierra Subregional Planning Group: • Renewable Energy Conceptual Transmission Plan • California Transmission Planning Group • Stakeholder comments: redispatch methodology, push RAS and SPS studies to local BAs, TEPPC coordination and interface. (Refer to these and other SPGs under March PCC online documents)