1 / 7

PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair for COPS Meeting

PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair for COPS Meeting December 8, 2008. Updated PWG 2008 Goals (ranked by Target Date).

oakes
Download Presentation

PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair for COPS Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair for COPS Meeting December 8, 2008

  2. Updated PWG 2008 Goals (ranked by Target Date)

  3. 18b. Distributive Generation load profiling implementation issues A. Pending AMR Rule, AMIT and DGTF B. LPGRR being drafted C. LPGRR031 Profile Decision Tree Changes for DRG Passed COPS D. Approved on 11/17/2008 and Effective 1/1/2009 2. 2008 Annual Validation A. On Schedule for 11/30/2008 completion. 17. Advanced Metering Implementation LPG changes if needed A. Pending AMR Rule, AMIT and DGTF B. LPGRR032 Profile Decision Tree Changes for Advanced Meters was filed C. Discussed and provided Pro and Con to the AMIT team for use of “AMS” in the meter type code of the Profile ID assignment D. LPGRR032 IA shall be reviewed at the Dec. PWG meeting Active Projects

  4. 7. IDR Analysis – 2 issues outstanding from original analysis A. November PWG agenda item B. Pertains to the minimum IDR requirement final recommendations for additional study using load research data C. AMR Rule, AMIT and DGTF may affect scope D. Shall move to 2009 goals Up-coming Project

  5. Other LPGRR and PRR Drafts in progress Draft PRR to remove PRR478 and PRR385 gray boxes from Protocal and LPG Language has been reviewed by PWG and shall be filed by the Chair on the PWG behalf. Draft PRR on providing Annual Validation timeline flexible language for Hurricane Season impacts to milestone target dates.

  6. Request the COPS Approval

  7. Questions? PWG 2008 meeting dates; Dec. 18 and perhaps the fourth Wednesday of the month

More Related