1 / 5

Gas Turbine Engine Project Materials Joint Test Protocol

Gas Turbine Engine Project Materials Joint Test Protocol. Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs and DoD Repair Depots. Component Alloys. Seven alloys selected for technical evaluation IN718, INC901, AM355, A286, 17-4PH, 4340, 9310.

nitza
Download Presentation

Gas Turbine Engine Project Materials Joint Test Protocol

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas Turbine Engine ProjectMaterials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs and DoD Repair Depots

  2. Component Alloys Seven alloys selected for technical evaluation IN718, INC901, AM355, A286, 17-4PH, 4340, 9310

  3. Coating Compositions to beInvestigated in Project HVOF ProcessAir Plasma Spray Process WC/17Co WC/17Co Cr3C2/(20)NiCr Co/28Mo/8Cr/2Si* Co/28Mo/8Cr/2Si* Co/28Mo/17Cr/3Si** * Tribaloy 400 ** Tribaloy 800

  4. Materials JTP Structure FIVE MAJOR TASKS: 1. Spray process optimizations 2. Fatigue 3. Wear and friction Fretting tests, carbon seal tests 4. Corrosion tests 5. Producibility tests - Stripability - Assembly/Disassembly

  5. Current Status of Materials JTP • Document finalized and being distributed for signatures • Acquisition of all raw materials completed and delivered to Metcut Research in Cincinnati • PO issued for fabrication of 1300 fatigue coupons; work in progress • PO issued to Hitemco on Long Island for coatings optimization work; Jerry Schell coordinating effort on HVOF Tribaloy 800 and Cr3C 2/NiCr, and Plasma Spray WC/Co and Tribaloy 400; first series of tests conducted in August 2001 • Overall schedule established for phased execution of sample preparation, coating, and testing

More Related