1 / 13

Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies

APARTMENT HOUSES CHÝNĚ Author of the slides: Ing. Miroslav Jindrák RD Rýmařov s.r.o. Case study no. 5. Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies PC 3 – A set of case studies. Content of slides. Apartment houses Chýně The basic version in two designs

nora
Download Presentation

Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APARTMENT HOUSES CHÝNĚAuthor of the slides: Ing. Miroslav Jindrák RD Rýmařov s.r.o.Case study no. 5 Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies PC 3 – A set of case studies

  2. Content of slides • Apartment houses Chýně • The basic version in two designs • Profile of the external wall • Profile of the ceiling construction • The ground plan • Technical parameters • Building Assembly • Increase of fire resistance for bearing external walls • Construction time of key delivery

  3. Locality construction of 32 timber-based multistoried detached and terrace houses. Turn-key delivery including groundwork, house connections, ground completion and fencing. Apartment houses Chýně

  4. The houses have two stories with two studio apartments. The basic version is delivered with a saddle roof with a roof inclination of 38. RD 180/38 apartment houses are offered in the basic version in two designs: 6 dwelling units: 6 dwelling units 69,03 m2 10 dwelling units: 4 dwelling units35,15 m2, 4 dwelling units37,50 m2, 2 dwelling units69,03 m2 The basic version in two designs

  5. 1. contact thermo facade 2. gypsum wood-fibre board 15 mm 3. mineral insulation 120 mm 4. gypsum wood-fibre board12,5 mm 5. gypsum plasterboard 12,5 mm 6. frame construction 120 mm Profile of the external wall

  6. 1. anhydrite compound 55 mm 2. Rotaflex 25/20 TSPS 02 3. Mirelon 5 mm 4. particle board 22 mm 5. mineral insulation ORSIL 120 mm 6. Lathing30x60 7. 2x gypsum plasterboard 12,5 mm Profile of the ceiling construction

  7. The ground plan

  8. Technical parameters

  9. Building Assembly

  10. Increase of fire resistance for bearing external walls REI 60 was required for wall exposed to external heat stress Walls were lined with boards MULTIPOR 600x390x80 firmproduct Xella, having increased the external wall fire resistance toREI 90

  11. Increase of fire resistance for bearing external walls

  12. Groundwork: 14 days Upper timberwork: 67 days -> with a technological interval of 28 days for anhydride maturing Total costs for construction: 7,1 mil. CZK Construction time of key delivery

  13. Thank you for your attention! http://fast10.vsb.cz/temtis/en/