APARTMENT HOUSES CHÝNĚ Author of the slides: Ing. Miroslav Jindrák RD Rýmařov s.r.o. Case study no. 5. Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies PC 3 – A set of case studies. Content of slides. Apartment houses Chýně The basic version in two designs
E N D
APARTMENT HOUSES CHÝNĚAuthor of the slides: Ing. Miroslav Jindrák RD Rýmařov s.r.o.Case study no. 5 Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies PC 3 – A set of case studies
Content of slides • Apartment houses Chýně • The basic version in two designs • Profile of the external wall • Profile of the ceiling construction • The ground plan • Technical parameters • Building Assembly • Increase of fire resistance for bearing external walls • Construction time of key delivery
Locality construction of 32 timber-based multistoried detached and terrace houses. Turn-key delivery including groundwork, house connections, ground completion and fencing. Apartment houses Chýně
The houses have two stories with two studio apartments. The basic version is delivered with a saddle roof with a roof inclination of 38. RD 180/38 apartment houses are offered in the basic version in two designs: 6 dwelling units: 6 dwelling units 69,03 m2 10 dwelling units: 4 dwelling units35,15 m2, 4 dwelling units37,50 m2, 2 dwelling units69,03 m2 The basic version in two designs
1. contact thermo facade 2. gypsum wood-fibre board 15 mm 3. mineral insulation 120 mm 4. gypsum wood-fibre board12,5 mm 5. gypsum plasterboard 12,5 mm 6. frame construction 120 mm Profile of the external wall
1. anhydrite compound 55 mm 2. Rotaflex 25/20 TSPS 02 3. Mirelon 5 mm 4. particle board 22 mm 5. mineral insulation ORSIL 120 mm 6. Lathing30x60 7. 2x gypsum plasterboard 12,5 mm Profile of the ceiling construction
Increase of fire resistance for bearing external walls REI 60 was required for wall exposed to external heat stress Walls were lined with boards MULTIPOR 600x390x80 firmproduct Xella, having increased the external wall fire resistance toREI 90
Groundwork: 14 days Upper timberwork: 67 days -> with a technological interval of 28 days for anhydride maturing Total costs for construction: 7,1 mil. CZK Construction time of key delivery
Thank you for your attention! http://fast10.vsb.cz/temtis/en/