100 likes | 177 Views
One of our most valuable goods is a clean environment. This working with garbage destroy our environment!! The Problems are:. - Contamination. - Danger of disease and epidemics. - Rising costs which can no longer be financed. - Wasting of energy and raw materials.
E N D
One of our most valuable goods is a clean environment
This working with garbage destroy our environment!! The Problems are: - Contamination - Danger of disease and epidemics - Rising costs which can no longer be financed - Wasting of energy and raw materials - Increasing protest among the population
The open landfill! Faulting of the landscape by wind dispatch Smell Gas emission Dangerfire and explosions Vermins River Contamination of the wells, rivers, and streams and agricultural land Groundwater
Solution 1 = protected landfill Faulting of the landscape by wind dispatch Reduction of smell Gas Siphon River Ground insulation Sevage plant Groundwater
This is modern waste management Clean bales instead of dangerous stinking landfills Waste packing Baled energy Refuse collection Creation of waste Biomass Recyclable materials Energy Valuable raw materials Transport and suitability for storage without environmental damage Utilisation of the materials in waste by seperation Into biological and recyclabele materials Utilisation of energy Electricity and heat Waste replaces fossil fueles reduction of discharges of co2 and ch4 New energy: Waste becomes a fuel
The functioning principle of the powerpack system • New technology conserves waste: • crashing • compressing • packing • Round bales wrapped into foils are the result. The waste gets new qualities: • Secure for the environment • Moveable without faulting • Smell free • no wind dispatch • Storage on reduced area
The economic aspects Costs of the plant 2.5-3.5 Mill. € ca. 10-12 Mill. € Investments for the City 0 ca. 10-12 Mill. € Storage costs per ton 25 € 22-24 € Annual total costs 1.35 Mill. € 1.18 Mill. € + loan costs Acreage for 500.000 tons 5 ha 15 ha Costs for country purchase for the City 15 ha Construction time 2 Monate 48 Monate Expansion without further costs Maintains calorific value(approx. 200 l Oil/ton) Mobile usable Forward- looking
The recultivation of old dumps Pre-sorting and intermediate storage Thermic utilisation with Incineration facilities (power-heating systems) Mechanical treatment Mobile plants for processing, separation, metal eliminate and packing for the transport Ash Cold Treadment Addition of lime ash and mineral sludge (e.g. gravel washing residue) conditions and immoveable Electrical and heating delivery