160 likes | 287 Views
FIBER ORIENTED MODULE UPGRADE PRESENTED TO EACOM TIMBER CORPORATION NAIRN CENTER MILL. PROJECT DESCRIPTION. The proposed quotation covers de sales and installation of the Fiber Oriented Module offered as an upgrade for the 990 Line; VAB Solutions proposes to install a new vision chamber;
E N D
FIBER ORIENTED MODULE UPGRADE PRESENTED TO EACOM TIMBER CORPORATION NAIRN CENTER MILL
PROJECT DESCRIPTION • The proposed quotation covers de sales and installation of the Fiber Oriented Module offered as an upgrade for the 990 Line; • VAB Solutions proposes to install a new vision chamber; • In order to save time on the installation phase, VAB Solutions proposes to swap Eacoms actual optimizer enclosure with a new one; • This new vision chamber will include: • 2 sets of new high resolution Cameras and Ellipse Lasers (2 for the Faces & 2 for the Edges); • 1 complete industrial server computer for the vision.
PROJECT DESCRIPTION • The Fiber Oriented Module will allow to detect and grade accurately all knots, grain distortion and wood compression. • This proposal is the result of multiple tests done at VAB Solutions site with a canadian business partner and a Southeastern USA partner for the Southern Yellow Pine;
NEW EQUIPMENT PROPOSED MATERIALS • FIBER ORIENTED MODULE • New Vision chamber in Steel plate construction; • (4) High Resolution cameras on each faces; • (4) New Ellipse lasers on each faces; • (1) Complete industrial server computer, with cards, keyboard and mouse for vision system; • Software.
MANPOWER OFFERED NO COST • Complete system assembly ; • Pre-installation visit and installation engineering; • Integration to the actual Optimizer; • Mechanical installation and supervision; • Parameters setup and training; • System start up; • Free technical support for one year.
PROPOSED INSTALLATION & DELIVERY • Installation of the Fiber Oriented Module can be done on a one day shutdown followed by a weekend. • The new module will be prepared in VAB Solutions facility with a new optimizer enclosure in order to save time during the onsite installation. VAB Solutions proposes to do a swap with Eacoms actual optimizer enclosure and recover all items (cables, vision, lasers, wire etc...). • Installation date can be done on the 1rst week of December2014.
NEW EQUIPMENT PROPOSED NEW VISION CHAMBER
FIBER ORIENTATION MODULE (Tracheid) • Knots • Slope of grain • Compression wood
FIBER ORIENTATION MODULE (Tracheid)
ADDITION VISION SYSTEMS ON THE ACTUAL VISION CHAMBER • 2 set of new face & edge vision cameras • 2 set of new face & edge tracheid lasers • 1 complete industrial server computer for the vision system
MODULE D’ORIENTATION DE LA FIBRE • Noeuds • Déviation du fil • Bois de compression
MODULE D’ORIENTATION DE LA FIBRE LOCALISATION DE LA MOELLE
MODULE D’ORIENTATION DE LA FIBRE LOCALISATION DE LA MOELLE
MODULE D’ORIENTATION DE LA FIBRE ÉCHANTILLON DE PLANCHES