Urban transport network challenges in Budapest

Urban transport network challenges in Budapest. Dávid Vitézy CEO BKK Centre for Budapest Transport. PSO Contract Structure. The new governance structure More tasks, new task sharing scheme, fewer employees. Previously non-managed tasks New projects worth HUF 100 bill ion

olathe
Download Presentation

Urban transport network challenges in Budapest

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Urban transport network challenges in Budapest Dávid Vitézy CEOBKK Centre for Budapest Transport

  2. PSO Contract Structure

  3. The new governance structureMore tasks, new task sharing scheme, fewer employees • Previously non-managed tasks • New projects worth HUF 100 billion • Project preparation, implementation and management • Regulation and Quality Assurance of taxi services • Continuous quality and cost control of BKV • Higher quality level • No increase in headcount More effective operation Total number of employees of Budapest transport governance system

  4. Mobility challenges in Budapest Increase of car traffic • 1990 – 2008 steady growth • 2008 – 2013 slight increase, stagnation Decrease of PT usage until 2010 New tendencies • Mobility management through new transport governance framework (BKK) • Strategic goal: Budapest to become a more liveable city • Increase modal share of cycling Actions taken • Major transport development projects • Network optimalisation

  5. Public transport network Vehicles (of 4 main subsectors) • 1,350 buses • 464 trams (including 36 Combino) • 117 trolley buses (including 27 low-floor) • 381 metro cars

  6. Public transport – organising PT in Budapest • 3.322 km of transport network • Planning, scheduling and update of the operation of 307 lines • Organising the daily circulation of 2,268 vehicles • Commissioning 18.5 billion passenger space-kms • Absolving 1.4 billion trips per year

  7. Public transport – organising PT in Budapest BKK’s tasks: • Routing • Scheduling • Defining traffic order • Passenger information services • 150-200 service instructions per year (permanent route or network changes) • 750-800 action plans per year (extraordinary service changes, stop relocations, routing)

  8. Metropolitan Area TransportServing nearly half a million passengers • BKK provides transport services outside the administrative boundaries of Budapest • Bus: 50.4 million passengers/year • Suburban Railway: 43.4 million passengers/year • 433.000 residents in the served areas • Integrated services: • Network and tariff system • Timetables and passenger information services • Traffic control • More than 50% of bus fleet is low-floor, barrier-free

  9. New Customer Service Points

  10. Development of Customer ServicesNew business opportunities • Adjusting ticket office business hours to customer demand • Introducing new ticket types: • Extension weekly Budapest pass • Annual pass with rolling validity from day of purchase • 5/30 BKK travelcard • Public transport boat tickets: revenuepotential from tourism • 54 ticket offices, 2 customer service points • 238 ticket sales assistants • 134 distribution sites (newsagents, post offices, MÁV Hungarian State Railways ticket offices etc)

  11. Customer CommunicationNew quality level of passenger information • bkk.hu website (timetables, traffic information): 32,000 visitors per day • BKK Facebook (real-time traffic information channel: 31,000 visits/day • An average of 13,000 customer queries/month • Communication of 60 updates on services changes/month • Ongoing communication of traffic changes, refurbishments • Maps, information overview materials • Monthly averages of in-house graphic design products: • 300 infographics, 40 maps, 70 vehicle side-sign graphics • 2,500 timetable signs, 1,400 printed vehicle side-signs, 3,600 printed information leaflets • BKK INFO: real-time, up-to-date information, currently 6,500 subscribers • BKK INFO: development of mobile app

  12. Visible results: revenue increase instead of price increase Price and revenue compared to previous year Year/year price index (%) and fare revenue index index (%)

  13. Front-door only boarding policy • Reducing fare evasion • Cleaner vehicles, safer travel • Ticket sale onboard Percentage of bus lines with the front-door only boarding policy

  14. Development of PT services Reform of night-time transport services • 0-24 Combino tram on Grand Boulevard (ring road) • 3 new nightbus lines, 12% service increase • Network development, 50% cost-saving on internal service lines (HUF 129 million/year) • Extended public service • 12% more services • HUF 129 million cost reduction Performance changes (daily line km)

  15. Prioritisation of PT vehicles • Traffic light programming • 30 signalled junctions • Longer green period • Facilitation of delayed vehicles with the help of the FUTÁR AVL system • Management of vehicles on intersecting lines • No need for driver’s involvement

  16. M4 metro development • Full budget: EUR1.3 bill • EU & national co-funding: 50-60% • Technical content:2 tunnels, 7.4 kms,Driverless trains, 10 newstations • Status: 80% complete • To be completed byQ1 2014

  17. ”Heart of Budapest” • urban development of public spaces in the city centre • enjoyable walking experience for locals and tourists alike, barrier-freeaccessibility • more green areas, cleaner air • reduced traffic by level crossings

  18. Refurbishment of Tramlines 1 and 3 • Total cost: 132 million EUR • EU & national co-financing: 93.92% • Technical content:Upgrade and extension of tram line1 (13.4 km) and of tram line 3 (13.5 km) • Status: contracted • To be completed by 2015

  19. Interconnected tram network in Buda • Total cost: 48 million EUR • EU & national co-financing: 83.4% • Technical content: Creating direct connection between North- and South-Buda, new service arrangement • Status: under procurement (building permits to be issued by Q4 2013) • To be completed by 2015

  20. New tram and trolleybus rolling stock • Total project cost: EUR 140 million • EU & national co-financing: 99.33% • Technical content: 25 low-floor trams (32-36 m), 12 low-floor trams (52-56 m) + 236% option for 12 long and 75 regular vehicles, 10 low-floor trolleys (articulated), 14 low-floor trolleys (non-articulated) + 279% option for 7 non-articulated and 60 articulated vehicles, additional infrastructure development (incl. 3 tram depots) • Status: under procurement • To be completed by 2015

  21. Vehicle fleet upgrade Since 2011: procurement of second-hand vehicles in good condition • 130 buses (40 more underway) • 15 trolleybuses

  22. Vehicle fleet upgradenew buses without debt increase

  23. Improvement of cycling infrastructure 6.5 km bus&bikelanes; 6.6 km bike paths, 2.4 km newcyclelanes; advisorycyclelane 12 km, 50 one-streetcontraflow 5 Bike-box

  24. Public bike-sharing system (”bubi”) • Full budget: EUR 3.53 million • EU & national co-funding:85% • Technical content:12.75 km2 operationalarea, 74 locations(average distance 560m),1,011 bikes – 1,514 dockingunits • Status: contracted • To be completed by Q1 2014

  25. FUTÁR Project • New GPS-based central traffic management and passenger information system for surface transport services • All trams, buses and trolleys will be equipped by satellite geographical positioning system • New radio communications system • On-board visual and acoustical passenger information • Real-time travel data in SMS text messages, online journey planner • Results: more reliable public transport • System owned and operated by BKK • Full budget: EUR 22.3 million

  26. Automated Fare Collection (AFC) system • Full budget: EUR 54.5 million • EBRD loan • 300 new ticket vending machines, new automated fare collection system, introduction of electronic passes, onboard and platform validators, metro access gates, time-based tickets (pay-as-you-go) • Status: ongoing • To be completed by 2016

  27. Development projects for 2014-2025 • Reconstruction and extension of metro line M1 • Interoperability of M2 and HÉV suburban railway lines H8-H9 • The southern section of metro line M5 • Development of a complex tram and trolleybus network in Budapest • Extension and reconstruction of metro line M3 • Extension of tram line 42 • Reconstruction and extension of tram line 2 • Reconstruction and extension ofBudapest Cog-wheel Railway

  28. Questions

  29. Thank you for your kind attention!