GREEN ENERGY THAT WORKS. Greeley Colorado June 30, 2009 Dan Perry – Wyoming/Colorado Equipment. AGENDA About Endurance Endurance Products Wind Working For You. Points of Interest!. About Endurance. Surrey BC – Manufacturing R&D - Spanish Fork Utah
E N D
Greeley Colorado June 30, 2009Dan Perry – Wyoming/Colorado Equipment • AGENDA • About Endurance • Endurance Products • Wind Working For You
Points of Interest! About Endurance • Surrey BC – Manufacturing • R&D - Spanish Fork Utah • Sales and Distribution – BTI Wind Energy – Greensburg KS • Colorado Equipment - CO
Company Background • Dean Davis and David Laino – Founding Engineers • (Won DOE Grant to design and build this machine original Turbine) • Formation of Company - Endurance Wind Power • (Partnered with Financial and Marketing Executives to become Endurance) • Commercialize S250 5 kw Turbine • (Turbine designed to offset needs of home owner: Designed to large wind specs for safety/production) • BTI Wind Energy – Greensburg • (Partnered with BTI Wind Energy to form tight Network of Sales/Service distributors from John Deere dealers) • Acquire Energy PGE – 35 and 50 kw Turbine • (Bought larger turbine manufacturer to fill the needs of our customer base…Schools, Municipalities, Farmers, Ranchers, Small Commercial, Small Industrial) • 100 + S250 Installations • G and E Series – 14 World Wide
Company Vision and Mission • Our vision: • World leader in distributed wind turbines. • Our mission: • Develop, manufacture and market, through a network of effective and reputable dealers, a product line of reliable, high performance wind turbines, specifically engineered to meet our customers’ needs.
Why Wind Power? • Save money on electricity • Hedge against ever increasing electricity prices • Independence from the grid • Impact on the environment • 1.5 lbs CO2 emission p/kwh of power – US average • Make a Statement
Why Endurance? • Engineering • Aesthetics • Safety • Efficiency • High Production in Low Wind • Quiet • Excellent support network – BTI
Product Line-up • S-343 5 kw model • E-3120 50 kw 3-phase* • G-3120 50 kw single phase* • *Power output can be reduced for states where net-metering regulation is limited to 40 kW • Main application: Grid-tied
G and E Series Description and Features • Main principles that governed the design • The highest energy production in its category. • Swept area of 3120 ft² (290 m²). • The blade aerodynamic profile is optimized for low wind sites. • Quiet sound and aesthetically sound • 20-year lifetime design (meets applicable IEC standards). • Ease of installation to reduce costs. • Designed for grid-tied connection (Three and single phase).
Wind – Working for YouSite Assessment and Feasibility • Power profile • Match production to consumption! • Wind resource evaluation • Firstlook, Windpro and others • Turbine selection • Match carefully ..Do Not Try to Overproduce • Site assessment • Data, Pictures, Measurments,Complete • Interconnection • Provide complete and accurate technical data • Incentives • Dsireusa.org, DOE – State Energy Office • ROI • Must make sense for customer!
Wind – Working for You • The “Paperwork” • Interconnection • Request from your utility company, complete in full! • Net Metering • Complete and return net metering agreement to utility! • Incentives • Complete loan or grant paperwork or hire someone who has experience. • Must be VERY Thorough! • Permits • Apply through municipality and follow steps.
Wind – Working for You • Installation and Commissioning • Foundation • Electrical • Commissioning • Start producing power • Tell your friends!
Endurance World Tour Cornwall,England PGE 20/35
Endurance World Tour St-Jean-Port-Joli, Canada Makemo, French Polynesia 6 wind turbines PGE 20/32
Endurance World Tour PGE test site, Saint-Jean-Port-Joli Quebec, Canada PGE 20/50